IMCO General Construction, Inc. 8/28/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 8/28/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 10:41:25 AM
Creation date
8/28/2024 3:11:16 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
8/28/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Air Scour Blower Building Replacment
Tracking Number
0004489
Total Compensation
$948,290.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 10/27/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 10/7/2024 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
833
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Section 00 72 00 GENERAL CONDITIONS <br /> <br />City of Everett 00 72 00-7 June 2024 <br />WFP Air Scour Blower Building Replacement Issued for Bid <br />UP3813 <br />Owner, or Owner’s Representative, or their related entities, any duty or authority to supervise or <br />direct the performance of the Work or any duty or authority to undertake responsibility <br />inconsistent with the provisions of the Contract Documents. <br />2.2. DIVISION OF SPECIFICATIONS AND DRAWINGS <br />Specifications and Drawings are divided into groups for convenience. These divisions are not <br />for the purpose of apportioning Work or responsibility for Work among Subcontractors, <br />Suppliers and manufacturers. The Contractor is responsible for all Work shown or described, <br />regardless of location(s) in the Contract Documents. <br />2.3. DISCREPANCIES IN SPECIFICATIONS AND DRAWINGS <br />2.3.1. Errors and Omissions <br />If the Contractor, in the course of the Work, becomes aware of any errors or omissions in the <br />Contract Documents or in the Owner's field work, he or she shall immediately inform the <br />Owner’s Representative in writing. The Owner’s Representative will promptly review the matter <br />and if he or she finds an error or omission has been made, then he or she will determine the <br />corrective actions and advise the Contractor accordingly. If the corrective work associated with <br />an error or omission significantly increases or decreases the amount of Work called for in the <br />Contract, the Owner will issue an appropriate Change Order. After discovery by the Contractor <br />of an error or omission, related work performed by the Contractor shall be done at its risk unless <br />authorized by the Owner’s Representative and approved by the Owner. Omissions from the <br />Drawings or Specifications or the misdescription of details of Work that are manifestly <br />necessary to carry out the intent of the Drawings and Specifications, or that are customarily <br />performed, shall not relieve the Contractor from performing such omitted or misdescribed details <br />of the Work, but they shall be performed as if fully and correctly set forth and described in the <br />Drawings and Specifications. <br />2.3.2. Conflicting Provisions <br />Figure dimensions on drawings shall govern over scale dimensions and detail drawings shall <br />govern over general drawings. In the event an item of Work is described differently in two or <br />more locations on the Drawings and in the Specifications, the Contractor shall, upon request of <br />the Owner’s Representative, submit in writing to the Owner’s Representative the description <br />upon which the Contractor relied in preparing its Bid or laying out the Work. If the Owner’s <br />Representative directs the Contractor to perform Work in a manner other than that <br />contemplated by the Contractor in preparing its Bid or laying out the Work, Change Order <br />procedures will be followed. In this event, the Contractor shall submit to the Owner’s <br />Representative such supporting information, including bidding or layout documents, as may <br />reasonably be necessary for the Owner’s Representative to determine whether the Contract <br />Sum is increased, decreased or unchanged by the Change Order. <br />2.3.3. Utilities <br />2.3.3.1 General <br />The Owner has endeavored to determine the existence of utilities at the Site of the Work from <br />the records of the owners of known utilities in the vicinity of the Work. The positions of these <br />utilities as derived from such records are shown on the Drawings. No excavations were made to <br />verify the locations shown for underground utilities. The service connections to these utilities are <br />not shown on the Drawings. It shall be the responsibility of the Contractor to determine the exact <br />location of utilities and service connections thereto. Such field verification must be performed in <br />sufficient time so as not to impede the progress of the Work or fabrication of materials to be <br />incorporated into the Work. The Contractor shall call the Utility Location Request Center (one <br />call center) for location of utilities in the field not less than two (2) nor more than (10) ten <br />business days before the scheduled date of commencement of excavation. The Contractor shall