My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024/08/28 Council Agenda Packet
>
Council Agenda Packets
>
2024
>
2024/08/28 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2024 8:56:39 AM
Creation date
8/29/2024 8:53:13 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/28/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
BID SUMMARY <br />Water Filtration Plant Air Scour Blower Building Replacement <br />W.O.# UP 3813 <br />Date:7/16/2024 <br />For: <br />Bidder Name:Bidder Totals: <br />ENGINEER'S ESTIMATE $1,082,830.00 <br />IMCO General Construction $948,290.00 <br />Accord Contractors $1,288,294.28 <br />McClure and Sons $1,392,207.99 <br />Award Construction $1,456,883.75 <br />3200 Cedar Street, <br />Everett WA 98201 <br />(425)257-8800
The URL can be used to link to this page
Your browser does not support the video tag.