Laserfiche WebLink
Client:Date: <br />Project:File: <br />Proposal:Tab: <br />Number:Author: <br />SUMMARY TOTAL <br />PHASE 3.0 DESIGN $7,502 $7,502 <br />EXPENSES <br />PHASE 5.0 CONSTRUCTION ASSISTANCE $23,668 $23,940 <br />EXPENSES $272 <br />SUBTOTAL $31,442 <br />FEE TOTALS <br />SUMMARY SUBTOTAL $31,442 <br />SUBCONSULTANTS SUBTOTAL $0 <br />TOTAL $31,442 <br />Travis Kinder <br />FEE ESTIMATE WORKSHEET <br />City of Everett <br />Beverly Lake Sanitary Sewer Replacement & LS #47 <br />P241138-001R1 <br />July 31, 2024 <br />P241138-001R1 City of Everett Beverly Lake Sewage Lift Station Proposal Fees 2024_0731.xlsx <br />Summary <br />THE ABOVE RATES FEES QUOTED ARE VALID FOR A PERIOD OF 90 DAYS.