Laserfiche WebLink
Client:Date: <br />Project:File: <br />Proposal:Tab: <br />Number:Author: <br />PHASE 3.0: <br />Labor <br />Code <br /> Principal Engineer Project Manager 2 Project Manager 1 Senior Engineer 2 Senior Engineer 1 Engineer 3 Engineer 2 Engineer 1Project Admin Designer 2 Designer 1 AutoCAD 2 AutoCAD 1 AdminstrativeTotal <br />ENGINEERING RATES $200 $171 $168 $160 $154 $148 $142 $130 $114 $120 $114 $100 $94 $90 <br />300 PROJECT MANAGEMENT <br />PROJECT MANAGEMENT 4 $672 <br />PROJECT SCHEDULING <br />COORDINATION W/ ASSOC. PROJECTS <br />301 FIELD INVESTIGATION <br />302 DESIGN MEETINGS <br />PROJECT KICK-OFF 1 $160 <br />DESIGN COORDINATION (X) 2 2 $662 <br />DESIGN REVIEWS (X) <br />303 QA/QC 2 $342 <br />304 UTILITY COORDINATION <br />310 PIPING & INSTRUMENTATION DIAGRAMS <br />P&IDS <br />NETWORK DIAGRAMS <br />320 ONE-LINE DIAGRAMS <br />ONE-LINE DIAGRAM 4 $640 <br />MEDIUM VOLTAGE <br />EMERGENCY POWER <br />UPS <br />325 ENGINEERING RESEARCH 4 $640 <br />330 PLANS <br />DRAWING LIST <br />SYMBOL/LEGEND <br />SITE <br />MEDIUM VOLTAGE DISTRIBUTION <br />480V. POWER 4 4 $1,324 <br />120V. POWER 4 $640 <br />LIGHTING <br />400 HZ / DC POWER <br />INSTRUMENTATION/CONTROL 2 $320 <br />AUXILIARY SYSTEMS (A/V) <br />IN SLAB CONDUIT <br />GROUNDING 1 $160 <br />NETWORK / DATA / COMMS <br />SUBMITTAL PACKAGE ASSEMBLY (X) 2 $320 <br />341 REMOVAL DRAWINGS <br />342 ELEVATIONS & DETAILS <br />MEDIUM VOLTAGE ELEVATIONS <br />MCC SCHEDULE / ELEVATIONS <br />MISC ELEVATIONS / DETAILS 2 $320 <br />MCC CONTROL WIRING DIAGRAMS <br />CONTROL WIRING DIAGRAMS <br />Subtotal Hours 8 4 26 <br />*CONTINUED ON NEXT PAGE Subtotal $6,200 <br />FEE ESTIMATE WORKSHEET <br />City of Everett <br />Beverly Lake Sanitary Sewer Replacement & LS #47 <br />P241138-001R1 <br />July 31, 2024 <br />P241138-001R1 City of Everett Beverly Lake Sewage Lift Station Proposal Fees 2024_0731.xlsx <br />Phase 3.0 - Design <br />Travis Kinder <br />Tasks <br />THE ABOVE RATES FEES QUOTED ARE VALID FOR A PERIOD OF 90 DAYS.