Laserfiche WebLink
Client:Date: <br />Project:File: <br />Proposal:Tab: <br />Number:Author: <br />PHASE 3.0: <br />Labor <br />Code <br /> Principal Engineer Project Manager 2 Project Manager 1 Senior Engineer 2 Senior Engineer 1 Engineer 3 Engineer 2 Engineer 1Project Admin Designer 2 Designer 1 AutoCAD 2 AutoCAD 1 AdminstrativeTotal <br />ENGINEERING RATES $200 $171 $168 $160 $154 $148 $142 $130 $114 $120 $114 $100 $94 $90 <br />FEE ESTIMATE WORKSHEET <br />City of Everett <br />Beverly Lake Sanitary Sewer Replacement & LS #47 <br />P241138-001R1 <br />July 31, 2024 <br />P241138-001R1 City of Everett Beverly Lake Sewage Lift Station Proposal Fees 2024_0731.xlsx <br />Phase 3.0 - Design <br />Travis Kinder <br />Tasks <br />350 PLC SYSTEMS <br />PLC PANEL/BILL OF MATERIALS <br />PLC POWER DISTRIBUTION <br />I/O WIRING DIAGRAMS <br />CONTROL PANEL <br />360 CALCULATIONS <br />LOAD <br />FAULT CURRENT <br />LIGHTING (AGI) <br />ENERGY <br />VOLTAGE DROP <br />362 POWER SYSTEM ANALYSIS <br />FIELD DATA COLLECTION <br />UTILITY COORDINATION <br />DATA VERIFICATION & REVIEW <br />ONE LINE SYSTEM MODELING <br />SHORT CIRCUIT ANALYSIS <br />PROTECTIVE DEVICE COORD. <br />ARC FLASH HAZARD ANALYSIS <br />ARC FLASH LABELS <br />ENGINEERING REPORT <br />ARC FLASH LABELS INSTALLATION <br />366 ENGINEERING REPORTS <br />370 SCHEDULES <br />CONDUIT AND WIRING SCHEDULE <br />INSTRUMENT SCHEDULE <br />PANEL SCHEDULES 2 $320 <br />POWER SYSTEM SCHEDULE <br />380 CONSTRUCTION COST ESTIMATE <br />390 SPECIFICATIONS <br />SPECIFICATIONS 2 4 $982 <br />PROCUREMENT SPECIFICATIONS <br />OUTLINE SPECIFICATION <br />BIDDER DESIGN CRITERIA <br />395 PROCESS OPERATIONAL DESCRIPTION <br />396 OUTSIDE PLAN REVIEW <br />Total Hours 10 4 32 <br />Subtotal $7,502 <br />Expenses <br />$7,502TOTAL <br />THE ABOVE RATES FEES QUOTED ARE VALID FOR A PERIOD OF 90 DAYS.