Laserfiche WebLink
Client:Date: <br />Project:File: <br />Proposal:Tab: <br />Number:Author: <br />PHASE 5.0: <br />Labor <br />Code <br /> Principal Engineer Project Manager 2 Project Manager 1 Senior Engineer 2 Senior Engineer 1 Engineer 3 Engineer 2 Engineer 1Project Admin Designer 2 Designer 1 AutoCAD 2 AutoCAD 1 AdminstrativeTotal <br />ENGINEERING RATES $200 $171 $168 $160 $154 $148 $142 $130 $114 $120 $114 $100 $94 $90 <br />500 PROJECT MANAGEMENT <br />PROJECT MANAGEMENT 2 $336 <br />PROJECT SCHEDULING 1 $160 <br />BID SUPPORT/ MEETINGS 4 $640 <br />501 CONSTRUCTION ASSISTANCE <br />CONSTRUCTION ASSISTANCE 2 8 $1,622 <br />MEETINGS/SITE VISITS 2 10 $1,942 <br />SHOP DRAWING SUBMITTAL REVIEW 4 16 $3,244 <br />511 RFI RESPONSES 2 12 $2,262 <br />521 CONSTRUCTION COST ESTIMATE <br />522 EQUIPMENT PURCHASE ASSISTANCE <br />PURCHASE/BID SPECIFICATION <br />540 RECORD DRAWINGS 2 2 $662 <br />550 COMMISSIONING SERVICES <br />PANEL SHOP CHECKOUT/TESTING 6 $960 <br />FIELD I/O CHECKOUT/TESTING 12 $1,920 <br />START UP AND COMMISSIONING 40 $6,400 <br />DEVICE CONFIGURATION <br />570 OPERATOR TRAINING <br />580 O&M MANUALS <br />585 ARC FLASH <br />ONE LINE SYSTEM MODELING 12 $1,920 <br />SHORT CIRCUIT ANALYSIS <br />ARC FLASH HAZARD ANALYSIS 6 $960 <br />ARC FLASH LABELS 2 $320 <br />ENGINEERING REPORT <br />ARC FLASH LABELS INSTALLATION 2 $320 <br />590 FOLLOW-UP SERVICES <br />Total Hours 12 2 133 <br />Subtotal $23,668 <br />Expenses $272 <br />$23,940 <br />FEE ESTIMATE WORKSHEET <br />Tasks <br />TOTAL <br />City of Everett <br />Beverly Lake Sanitary Sewer Replacement & LS #47 <br />P241138-001R1 <br />July 31, 2024 <br />P241138-001R1 City of Everett Beverly Lake Sewage Lift Station Proposal Fees 2024_0731.xlsx <br />Phase 5.0 - Construction Assistance <br />Travis Kinder <br />THE ABOVE RATES FEES QUOTED ARE VALID FOR A PERIOD OF 90 DAYS.