Laserfiche WebLink
CITY OF EVERETT WEST MARINE VIEW DRIVE/ALVERSON AND 41 ST ST/GRAND AVE <br />PEDESTRIAN IMPROVEMENTS <br />STATE FUND# HLP-PB15(032) <br />WO #3630 July 25, 2024 <br />90 <br />1 7-20.1 Description <br />2 <br />3 This Work consists of replacing water meter box in accordance with the Construction Plans, <br />4 City of Everett Standard Drawings 501, & 502 and the Standard Specifications. The new water <br />5 meter box shall be adjusted to the grade as staked or otherwise designated by the ENGINEER. <br />6 <br />7 7-20.2 Materials <br />8 <br />9 Materials shall meet the requirements as specified in the COE Standard Drawings #501 & 502. <br />10 <br />11 7-20.3 Construction Requirements <br />12 <br />13 Where shown in the plans, existing valve boxes and covers shall be adjusted to the grade as <br />14 staked or otherwise designated by the Engineer <br />15 <br />16 All respective valve(s) shall be fully operational after adjustment. <br />17 <br />18 7-20.4 Measurement <br />19 <br />20 No measurement shall be made for removal of existing meter box, and lid, excavation, or <br />21 backfilling. <br />22 <br />23 7-20.5 Payment <br />24 Adjust Water Meter Box to Grade, per EACH. <br />25 <br />26 The unit contract price per each for "Adjust Water Meter Box to Grade" shall be full pay for all <br />27 costs necessary to make the adjustment including excavation, haul off, compaction during <br />28 restoration with crushed rock, and restoration of adjacent disturbed areas. <br />29 <br />30 <br />31 COE 7-20 REPLACE WATER METER BOX.rtf <br />32 7-20 WATER METER BOX <br />33 (******) <br />34 <br />35 Section 7-20 is new and is supplemented with the following: <br />36 <br />37 7-20.1 Description <br />38 <br />39 This Work consists of replacing water meter box in accordance with the Construction <br />40 Plans, City of Everett Standard Drawings 501, & 502 and the Standard Specifications. The <br />41 new water meter box shall be adjusted to the grade as staked or otherwise designated by the <br />42 ENGINEER. <br />43 <br />44 7-20.2 Materials <br />45 <br />46 Materials shall meet the requirements as specified in the COE Standard Drawings #501 & 502.