My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Diverse Earthworks, Inc 9/16/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Diverse Earthworks, Inc 9/16/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2025 1:32:48 PM
Creation date
9/16/2024 10:52:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Diverse Earthworks, Inc
Approval Date
9/16/2024
Council Approval Date
9/11/2024
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
WEST MARINE VIEW DRIVE/ALVERSON AND 41ST ST/GRAND AVE PEDESTRIAN IMPROVEMENTS
Public Works WO Number
3630
Tracking Number
0004512
Total Compensation
$519,436.93
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Diverse Earthworks, Inc 4/24/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT WEST MARINE VIEW DRIVE/ALVERSON AND 41 ST ST/GRAND AVE <br />PEDESTRIAN IMPROVEMENTS <br />STATE FUND# HLP-PB15(032) <br />WO #3630 July 25, 2024 <br />90 <br />1 7-20.1 Description <br />2 <br />3 This Work consists of replacing water meter box in accordance with the Construction Plans, <br />4 City of Everett Standard Drawings 501, & 502 and the Standard Specifications. The new water <br />5 meter box shall be adjusted to the grade as staked or otherwise designated by the ENGINEER. <br />6 <br />7 7-20.2 Materials <br />8 <br />9 Materials shall meet the requirements as specified in the COE Standard Drawings #501 & 502. <br />10 <br />11 7-20.3 Construction Requirements <br />12 <br />13 Where shown in the plans, existing valve boxes and covers shall be adjusted to the grade as <br />14 staked or otherwise designated by the Engineer <br />15 <br />16 All respective valve(s) shall be fully operational after adjustment. <br />17 <br />18 7-20.4 Measurement <br />19 <br />20 No measurement shall be made for removal of existing meter box, and lid, excavation, or <br />21 backfilling. <br />22 <br />23 7-20.5 Payment <br />24 Adjust Water Meter Box to Grade, per EACH. <br />25 <br />26 The unit contract price per each for "Adjust Water Meter Box to Grade" shall be full pay for all <br />27 costs necessary to make the adjustment including excavation, haul off, compaction during <br />28 restoration with crushed rock, and restoration of adjacent disturbed areas. <br />29 <br />30 <br />31 COE 7-20 REPLACE WATER METER BOX.rtf <br />32 7-20 WATER METER BOX <br />33 (******) <br />34 <br />35 Section 7-20 is new and is supplemented with the following: <br />36 <br />37 7-20.1 Description <br />38 <br />39 This Work consists of replacing water meter box in accordance with the Construction <br />40 Plans, City of Everett Standard Drawings 501, & 502 and the Standard Specifications. The <br />41 new water meter box shall be adjusted to the grade as staked or otherwise designated by the <br />42 ENGINEER. <br />43 <br />44 7-20.2 Materials <br />45 <br />46 Materials shall meet the requirements as specified in the COE Standard Drawings #501 & 502.
The URL can be used to link to this page
Your browser does not support the video tag.