My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Diverse Earthworks, Inc 9/16/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Diverse Earthworks, Inc 9/16/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2025 1:32:48 PM
Creation date
9/16/2024 10:52:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Diverse Earthworks, Inc
Approval Date
9/16/2024
Council Approval Date
9/11/2024
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
WEST MARINE VIEW DRIVE/ALVERSON AND 41ST ST/GRAND AVE PEDESTRIAN IMPROVEMENTS
Public Works WO Number
3630
Tracking Number
0004512
Total Compensation
$519,436.93
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Diverse Earthworks, Inc 4/24/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT WEST MARINE VIEW DRIVE/ALVERSON AND 41 ST ST/GRAND AVE <br />PEDESTRIAN IMPROVEMENTS <br />STATE FUND# HLP-PB15(032) <br />WO #3630 July 25, 2024 <br />91 <br />1 <br />2 7-20.3 Construction Requirements <br />3 The materials and method of construction shall conform to the product requirements, <br />4 and instructions. The new meter box and lid shall be raised or lowered to the required elevation <br />5 with riser sections. <br />6 <br />7 All respective valve(s) shall be fully operational after replacement. <br />8 <br />9 7-20.4 Measurement <br />10 Water meter lid shall be included with the water meter box. <br />11 <br />12 No measurement shall be made for removal of existing meter box, and lid, excavation, <br />13 or backfilling. <br />14 <br />15 7-20.5 Payment <br />16 Replace water meter box, per EACH. <br />17 <br />18 All labor, equipment and materials required to remove and disposal of the old water meter box <br />19 and lid, and installation of the new water meter box and lid shall be included in the unit Contract <br />20 price for the item installed. <br />21 <br />22 END DIVISION7.RTF <br />23 <br />24 END DIVISION 7 <br />25
The URL can be used to link to this page
Your browser does not support the video tag.