My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Diverse Earthworks, Inc 9/16/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Diverse Earthworks, Inc 9/16/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2025 1:32:48 PM
Creation date
9/16/2024 10:52:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Diverse Earthworks, Inc
Approval Date
9/16/2024
Council Approval Date
9/11/2024
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
WEST MARINE VIEW DRIVE/ALVERSON AND 41ST ST/GRAND AVE PEDESTRIAN IMPROVEMENTS
Public Works WO Number
3630
Tracking Number
0004512
Total Compensation
$519,436.93
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Diverse Earthworks, Inc 4/24/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT WEST MARINE VIEW DRIVE/ALVERSON AND 41 ST ST/GRAND AVE <br />PEDESTRIAN IMPROVEMENTS <br />STATE FUND# HLP-PB15(032) <br />WO #3630 July 25, 2024 <br />95 <br />1 8-02.3(5).GR8 <br />2 Roadside Seeding, Lawn and Planting Area Preparation <br />3 <br />4 8-02.3(5).INST1.GR8 <br />5 Section 8-02.3(5) is supplemented with the following: <br />6 <br />7 8-02.3(5).OPT4.GR8 <br />8 (August 4, 2014) <br />9 Removal of Buried Previously Fabricated Debris <br />10 The Contractor shall remove buried previously fabricated debris as directed by the <br />11 Engineer to a maximum depth of two feet. The excavated debris shall be removed <br />12 from the project site to a disposal facility approved by the Engineer. <br />13 <br />14 8-02.3(6).GR8 <br />15 Mulch and Amendments <br />16 <br />17 8-02.3(6)B.GR8 <br />18 Fertilizers <br />19 <br />20 8-02.3(6)B.INST1.GR8 <br />21 Section 8-02.3(6)B is supplemented with the following: <br />22 <br />23 8-02.3(6)B.OPT3.GR8 <br />24 (September 3, 2019) <br />25 Fertilizer shall be a commercially prepared mix of 10-20-20 and shall be applied <br />26 at the rate of 10 pounds per 1000 square feet. <br />27 <br />28 8-02.3(9)B.GR8 <br />29 Seeding and Fertilizing <br />30 <br />31 8-02.3(9)B.INST1.GR8 <br />32 Section 8-02.3(9)B is supplemented with the following: <br />33 <br />34 8-02.3(9)B.OPT2.GR8 <br />35 (September 3, 2019) <br />36 Grass seed shall be a commercially prepared mix, made up of low growing <br />37 species which will grow without irrigation at the project location, and accepted by <br />38 the Engineer. The application rate shall be two pounds per 1000 square feet. <br />39 <br />40 8-02.3(11).GR8 <br />41 Mulch <br />42 <br />43 8-02.3(11).INST1.GR8 <br />44 Section 8-02.3(11) is supplemented with the following: <br />45 <br />46 8-02.3(11).OPT1.FR8 <br />47 (April 2, 2012) <br />48 Bark mulch or wood chip mulch shall be placed to a uniform non-compacted depth of <br />49 *** $$1$$ *** over all planting areas. <br />50 <br />51 Bark or wood chip mulch shall not be placed in areas of standing or flowing water.
The URL can be used to link to this page
Your browser does not support the video tag.