Laserfiche WebLink
CITY OF EVERETT WEST MARINE VIEW DRIVE/ALVERSON AND 41 ST ST/GRAND AVE <br />PEDESTRIAN IMPROVEMENTS <br />STATE FUND# HLP-PB15(032) <br />WO #3630 July 25, 2024 <br />98 <br />1 <br />2 (******) <br />3 It is expected there will be sufficient suitable native material excavated from various <br />4 portions of the improvement to fill low areas in the sidewalk subgrade and planting <br />5 strip area when needed and no further payment will be allowed for fill material. <br />6 Where there is insufficient suitable native material on the project site, the Contractor <br />7 shall furnish, place and compact CSBC meeting the requirements of Section 4-04 of <br />8 these Specifications. <br />9 <br />10 <br />11 8-14.3(6)Curb Ramp <br />12 <br />13 Section 8-14.3 (6) is new and is supplemented with the following: <br />14 (******) <br />15 Curb ramp locations will be designated on the drawings or marked in the field by the <br />16 Engineer. Where curb ramps are to be constructed, the Contractor shall construct <br />17 curb ramp in accordance to the City of Everett Standard Drawing #318, 319, 320, <br />18 321, or WSDOT Standard Drawings F-40.12-02, F-40.14-02, F-40.15-02, F-40.16- <br />19 02, F-45.10-01. <br />20 <br />21 Curb ramps shall be constructed separately from the sidewalk to produce a definite <br />22 break line between the ramp and the sidewalk. A 3/8 inch non-extruded through <br />23 joint material shall be installed between the curb and the sidewalk with edging as <br />24 specified in Section 8-14.3(3). <br />25 <br />26 8-14.4Measurement <br />27 <br />28 Section 8-14.4 is supplemented with the following: <br />29 <br />30 (******) <br />31 <br />32 "Modified Type_________Curb Ramp" per Each. <br />33 "Modified Half Flare Type_________Curb Ramp", per Each. <br />34 Median Cut-Through, per Each. <br />35 "Type ___ Curb Ramp", per Each. <br />36 Bid Items listed above does not include the adjacent Curb, Curb and Gutter, Pedestrian <br />37 Curb or Sidewalks. <br />38 <br />39 8-14.5Payment <br />40 <br />41 Section 8-14.5 is supplemented with the following: <br />42 <br />43 (******) <br />44 <br />45 "Modified Type_________Curb Ramp", per Each. <br />46 "Modified Half Flare Type_________Curb Ramp", per Each. <br />47 Median Cut-Through, per Each.