Laserfiche WebLink
CITY OF EVERETT WEST MARINE VIEW DRIVE/ALVERSON AND 41 ST ST/GRAND AVE <br />PEDESTRIAN IMPROVEMENTS <br />STATE FUND# HLP-PB15(032) <br />WO #3630 July 25, 2024 <br />131 <br />1 <br />2 8-26.4 Measurement <br />3 Measurement of Cement Concrete Modular Block Unit Retaining Wall shall be per <br />4 square foot of retaining wall surface using the full wall height (top of base leveling pad <br />5 to the top of the final course); no further payment will be made except as shown in the <br />6 paragraph exclusions below. <br />7 <br />8 Including: Complete excavation, base leveling pad, compaction, unit drainage fill, CMB <br />9 units and shear connectors, geogrid soil reinforcement, reinforced backfill, bond <br />10 breaker geotextile, and other miscellaneous supplies. <br />11 <br />12 Excluding: Cement Concrete Sidewalk, new landscaping <br />13 <br />14 8-26.5 Payment <br />15 The unit contract price per square foot for Cement Concrete Modular Block Unit <br />16 Retaining Wall shall be full compensation for furnishing all material, labor, tools, and <br />17 equipment necessary to construct the Cement Concrete Modular Block Unit Retaining <br />18 Wall including, but not limited to, shop drawings (bearing the stamp of a professional <br />19 engineer registered to practice in the State of Washington), excavation, base leveling <br />20 pad, compaction, unit drainage fill, CMB units and shear connectors, geogrid soil <br />21 reinforcement, reinforced backfill, and bond breaker geotextile as shown in detail on <br />22 plans or as directed by the Engineer. Restoration of adjacent landscaping not included <br />23 in the payment. <br />24 <br />25 <br />26 <br />27 GKK 8-32 RESOLVED UNDERGROUND CONFLICT.rtf <br />28 (******) <br />29 <br />30 8-32 RESOLVED UNANTICIPATED CONFLICTS <br />31 Section 8-32 is new with the following: <br />32 <br />33 8-32.1 Description <br />34 <br />35 This work consists of resolving unanticipated conflicts to conform to the Project <br />36 requirements due to construction, where they are not addressed by the Construction <br />37 Plans and Details. These bid items might also be used to construct or modify items <br />38 which are not identified, nor addressed in the Plans and Details. <br />39 <br />40 8-32.2 Vacant <br />41 <br />42 8-32.3 Construction Requirements <br />43 <br />44 8-32.3(1)Aboveground Conflicts <br />45 As directed by Engineer, address and resolve above ground conflicts that need <br />46 modification to accommodate construction. <br />47