Laserfiche WebLink
Mechanical Requirements • • of <br /> 2021 WSEC Requirements for Commercial Buildings including Group R2,R3&R4 over 3 stories&all R1 -- Administered by @2024 NEEA,All rights reserved <br /> The following information is necessary to check a mechanical permit application for compliance with the mechanical systems and equipment requirements in the <br /> Washington State Energy Code,Commercial Provisions. <br /> For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com <br /> NA C403.5.3.3 Air economizer high Indicate high limit shut-off control method <br /> limit controls and required high limit per Table C403.5.3.3 <br /> NA C403.5.3.4 Relief of excess Refer to Requirements List section <br /> outdoor air Ventilation,Exhaust&Energy Recovery <br /> C403.5.3.4 Relief of excess Indicate relief air outlets are sized and <br /> outdoor air configured to relieve excess building air <br /> during air economizer operation to prevent <br /> building over-pressurization <br /> C403.5.3.4 Relief of excess Indicate relief air outlet are located to avoid <br /> outdoor air recirculation into the building <br /> C403.5.4.1 Water economizer For eligible systems where water-side <br /> capacity economizer may be provided in lieu of air <br /> economizer,indicate system is capable of <br /> 100%design cooling capacity at 50°F db/ <br /> 45°F wb outdoor air temperatures;indicate if <br /> threshold for 100%design cooling capacity <br /> via economizer must be lowered to 45°F db/ <br /> 40°F wb due to dehumidification <br /> requirements <br /> C403.5.4.2 Water economizer Indicate that the pressure drop across <br /> maximum pressure precooling coils and heat exchangers in water <br /> drop economizer systems do not exceed 15 feet <br /> (4572 mm) <br /> NA C403.5.5 DX equipment For DX air handlers with economizer and <br /> economizer fault cooling capacity>_54,000 Btu/h,provide a <br /> detection and fault detection and diagnostics(FDD)system <br /> diagnostics to monitor economizer system operation and <br /> report faults <br /> HYDRONIC SYSTEMS-EQUIPMENT SELECTION&PERFORMANCE <br /> C403.3.2.3 Maximum air cooled For chilled water plants and buildings with> <br /> chiller capacity 500 tons of cooling capacity,indicate air- <br /> cooled chiller capacity is< 100 tons,or <br /> exception applied <br /> C403.3.2.2 Large capacity For buildings>_300 tons of cooling capacity, <br /> cooling systems indicate method of multi-stage or variable <br /> capacity control(VSD,multiple staged <br /> compressors,or max capacity of any single <br /> unit <br /> C403.3.2.4 Non-standard water- For water-cooled centrifugal chillers not <br /> cooled centrifugal designed for operation at standard conditions, <br /> chillers provide calculations documenting maximum <br /> full load and part load rated equipment <br /> performance requirements <br /> C403.3.3 Hot gas bypass For cooling equipment with hot gas bypass, <br /> limitation for chillers provide either multiple step unloading or <br /> continuous capacity modulation;indicate <br /> bypass capacity per Table C403.3.3 <br /> C403.4.3 Large capacity boiler For hydronic systems with only a single boiler <br /> C403.3.4.4 systems that has>500,000 Btu/h input capacity, <br /> indicate multi-stage or modulating burner <br /> Page 19132 <br />