My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Moeco LLC 9/18/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Moeco LLC 9/18/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2024 10:37:00 AM
Creation date
9/18/2024 10:27:43 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Moeco LLC
Approval Date
9/18/2024
Council Approval Date
9/18/2024
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
18th Street Pedestrian Improvements
Tracking Number
0004515
Total Compensation
$329,191.61
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
18TH STREET PEDESTRIAN IMPROVEMENTS 3741 RMT July 03, 2024 10 The number of copies to be executed by the Contractor will be determined by the 1 Contracting Agency. 2 3 Within 20 calendar days after the award date, the successful bidder shall return the 4 signed Contracting Agency-prepared contract, an insurance certification as required by 5 Section 1-07.18, a satisfactory bond as required by law and Section 1-03.4, the Transfer 6 of Coverage form for the Construction Stormwater General Permit with sections I, III, and 7 VIII completed when provided. Before execution of the contract by the Contracting 8 Agency, the successful bidder shall provide any pre-award information the Contracting 9 Agency may require under Section 1-02.15. 10 11 Until the Contracting Agency executes a contract, no proposal shall bind the Contracting 12 Agency nor shall any work begin within the project limits or within Contracting Agency-13 furnished sites. The Contractor shall bear all risks for any work begun outside such areas 14 and for any materials ordered before the contract is executed by the Contracting Agency. 15 16 If the bidder experiences circumstances beyond their control that prevents return of the 17 contract documents within the calendar days after the award date stated above, the 18 Contracting Agency may grant up to a maximum of 20 additional calendar days for 19 return of the documents, provided the Contracting Agency deems the circumstances 20 warrant it. 21 22 1-03.4.RTF 23 1-03.4 Contract Bond 24 (July 23, 2015 APWA GSP) 25 26 Delete the first paragraph and replace it with the following: 27 28 The successful bidder shall provide executed payment and performance bond(s) for the 29 full contract amount. The bond may be a combined payment and performance bond; or 30 be separate payment and performance bonds. In the case of separate payment and 31 performance bonds, each shall be for the full contract amount. The bond(s) shall: 32 1. Be on Contracting Agency-furnished form(s); 33 2. Be signed by an approved surety (or sureties) that: 34 a. Is registered with the Washington State Insurance Commissioner, and 35 b. Appears on the current Authorized Insurance List in the State of Washington 36 published by the Office of the Insurance Commissioner, 37 3. Guarantee that the Contractor will perform and comply with all obligations, duties, 38 and conditions under the Contract, including but not limited to the duty and obligation 39 to indemnify, defend, and protect the Contracting Agency against all losses and 40 claims related directly or indirectly from any failure: 41 a. Of the Contractor (or any of the employees, subcontractors, or lower tier 42 subcontractors of the Contractor) to faithfully perform and comply with all contract 43 obligations, conditions, and duties, or 44 b. Of the Contractor (or the subcontractors or lower tier subcontractors of the 45 Contractor) to pay all laborers, mechanics, subcontractors, lower tier 46 subcontractors, material person, or any other person who provides supplies or 47 provisions for carrying out the work; 48 4. Be conditioned upon the payment of taxes, increases, and penalties incurred on the 49 project under titles 50, 51, and 82 RCW; and 50
The URL can be used to link to this page
Your browser does not support the video tag.