My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Moeco LLC 9/18/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Moeco LLC 9/18/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2024 10:37:00 AM
Creation date
9/18/2024 10:27:43 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Moeco LLC
Approval Date
9/18/2024
Council Approval Date
9/18/2024
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
18th Street Pedestrian Improvements
Tracking Number
0004515
Total Compensation
$329,191.61
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
18TH STREET PEDESTRIAN IMPROVEMENTS 3741 RMT July 03, 2024 11 5. Be accompanied by a power of attorney for the Surety’s officer empowered to sign 1 the bond; and 2 6. Be signed by an officer of the Contractor empowered to sign official statements (sole 3 proprietor or partner). If the Contractor is a corporation, the bond(s) must be signed 4 by the president or vice president, unless accompanied by written proof of the 5 authority of the individual signing the bond(s) to bind the corporation (i.e., corporate 6 resolution, power of attorney, or a letter to such effect signed by the president or vice 7 president). 8 9 1-03.7.RTF 10 1-03.7 Judicial Review 11 (December 30, 2022 APWA GSP) 12 13 Revise this section to read: 14 15 All decisions made by the Contracting Agency regarding the Award and execution of the 16 Contract or Bid rejection shall be conclusive subject to the scope of judicial review 17 permitted under Washington Law. Such review, if any, shall be timely filed in the Superior 18 Court of the county where the Contracting Agency headquarters is located, provided that 19 where an action is asserted against a county, RCW 36.01.050 shall control venue and 20 jurisdiction. 21 22 1-04.GR1 23 Scope of the Work 24 25 1-04.2.RTF 26 1-04.2 Coordination of Contract Documents, Plans, Special Provisions, 27 Specifications, and Addenda 28 (December 30, 2022 APWA GSP) 29 30 Revise the second paragraph to read: 31 32 Any inconsistency in the parts of the contract shall be resolved by following this order of 33 precedence (e.g., 1 presiding over 2, 2 over 3, 3 over 4, and so forth): 34 1. Addenda, 35 2. Proposal Form, 36 3. Special Provisions, 37 4. Contract Plans, 38 5. Standard Specifications, 39 6. Contracting Agency’s Standard Plans or Details (if any), and 40 7. WSDOT Standard Plans for Road, Bridge, and Municipal Construction. 41 42 1-05.GR1 43 Control of Work 44 45 COE 1-05.4.OPT4.docx 46 (March 9, 2023) 47 Contractor Surveying – ADA Features 48 ADA Feature Staking Requirements 49 The Contractor shall be responsible for setting, maintaining, and resetting all 50 alignment stakes, and grades necessary for the construction of the ADA features. 51
The URL can be used to link to this page
Your browser does not support the video tag.