My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Moeco LLC 9/18/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Moeco LLC 9/18/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2024 10:37:00 AM
Creation date
9/18/2024 10:27:43 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Moeco LLC
Approval Date
9/18/2024
Council Approval Date
9/18/2024
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
18th Street Pedestrian Improvements
Tracking Number
0004515
Total Compensation
$329,191.61
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
18TH STREET PEDESTRIAN IMPROVEMENTS 3741 RMT July 03, 2024 37 GSL 2-02 removal of structures and obstructions.docx 1 2-02.5 Payment 2 3 Section 2-02.5 is supplemented with the following: 4 5 (******) 6 7 “Removal of Structures and Obstructions”, per lump sum. 8 9 Description and Construction Requirements for Work include Existing Chain Link Fence 10 and associated appurtenances such as attached posts and foundations, gates, and 11 hardware to be removed as needed to do the Work and to be performed in accordance 12 with Section 2-02. 13 14 Measurement for Removal of Structures and Obstructions will be per lump sum and will 15 include Chain Link Fence, Fence Posts and Foundations, Corners, Gates, and Hardware 16 where shown and/or described in the plans. 17 18 The unit price per lump sum shall be full pay for all labor, materials, tools, and equipment 19 necessary to satisfactorily complete the Work as specified. 20 21 All labor, materials, tools and equipment necessary to disposal of removals shall be 22 included in the Contract Unit Price. 23 24 25 END DIVISION2.RTF 26 END DIVISION 2 27 28
The URL can be used to link to this page
Your browser does not support the video tag.