My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Carollo Engineers Inc 9/17/2024 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Carollo Engineers Inc 9/17/2024 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2024 1:29:47 PM
Creation date
9/18/2024 1:29:25 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Carollo Engineers Inc
Approval Date
9/17/2024
Council Approval Date
9/11/2024
End Date
12/31/2025
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
20th Street Sewer Rehabilitation Project
Public Works WO Number
UP 3799
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003742
Total Compensation
$73,485.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Carollo Engineers Inc. 5/4/2023
(Amendment)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
EXHIBIT A <br /> <br /> 2 <br />monthly invoices. Document expenditures on a task basis and show hours by project personnel and <br />other direct expenses related to work. Reports and invoicing will be formatted in a manner that is <br />acceptable to the City. <br />Subtask 120 – Quality Management <br />· Manage and execute quality control procedures for all deliverables. <br />· Manage Record of Comments to track City review comments and Consultant’s responses for all <br />project deliverables. <br /> <br />Assumptions: <br />1. Total project duration for construction is assumed to be 6 months. <br /> <br />Meetings: <br />1. None. <br /> <br />Deliverables: <br />1. Monthly invoices and progress reports. <br />Task 600 - ENGINEERING SERVICE DURING CONSTRUCTION (ESDC) <br />The purpose of this task is to prepare for, conduct, and document decisions and action items arising from <br />meetings and site visits during construction and associated with the project. Task 600 has the following <br />subtasks: <br />Subtask 610 – Preconstruction and Periodic Construction Meetings <br />· Prepare for and attend the pre-construction conference. <br />· Prepare conformed contract documents. Consultant will prepare conformed contract documents at <br />the start of construction and deliver a set of documents reflecting all contract changes made during <br />the bidding period. <br />Subtask 620 – Submittal Reviews/Revisions <br />· Review and respond to construction submittals. This task assumes that the City will coordinate and <br />manage the shop drawing and submittal review process and will distribute specific submittals for <br />the Consultant to review on an as needed basis. Consultant will complete reviews of submittals and <br />resubmittals and provide the City with a response on the City’s submittal form. Up to five submittals <br />are assumed to be reviewed by the Consultant with no re-submittal reviews. <br />Subtask 630 – RFI Review/Responses <br />· Review and respond to Contractor Requests for Information (RFI). This task assumes that the City <br />will coordinate and manage the RFI process between the City and the Contractor. Consultant will <br />complete reviews of the RFI and provide a City with a response. Up to four RFIs are assumed. <br />Subtask 640 – Change Order/Responses <br />· Review Change Order Requests (CO). Consultant will review change order requests in conjunction <br />with the City’s representative to determine changes in scope and conditions. Consultant will prepare
The URL can be used to link to this page
Your browser does not support the video tag.