My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6623 EVERGREEN WAY 2024-10-11
>
Address Records
>
EVERGREEN WAY
>
6623
>
6623 EVERGREEN WAY 2024-10-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2024 11:37:33 AM
Creation date
9/24/2024 3:45:05 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
6623
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ABBREVIATIONS(NOT ALL USED) SYMBOLS(NOT ALL USED) APPLICABLE CODES SHEET INDEX "t�p GR0&4 <br /> ims� 1 - <br /> SYMBOL DESCRIPTION NO. SHEET DESCRIPTION SCALE Vv 1 I <br /> ABV ABOVE SA SUPPLY AIR O - 2022 CALIFORNIA BUILDING CODE a' ll cn <br /> AFF ABOVE FINISHED FLOOR SF SUPPLY FAN 2022 CALIFORNIA RESIDENTIAL CODE 1 M001 NOTES,SYMBOLS,&ABBREVIATIONS N/A Mal, - <br /> T THERMOSTAT 2022 CALIFORNIA ELECTRICAL CODE "�.. <br /> AHU AIR HANDLING UNIT SOO SEQUENCE OF OPERATION - 2022 CALIFORNIA MECHANICAL CODE 2 M002 MECHANICAL GENERAL NOTES N/A <br /> AMB AMBIENT © TEMPERATURE SENSOR - 2022 CALIFORNIA PLUMBING CODE <br /> - 2022 CALIFORNIA FIRE CODE 3 M003 MECHANICAL SCHEDULE N/A <br /> ARCH ARCHITECTURAL SOV SHUT OFF VALVE - 2022 CALIFORNIA ENERGY CODE /► <br /> BDD BACKDRAFT DAMPER SP STATIC PRESSURE © CO2 SENSOR - 2022 CALIFORNIA GREEN BUILDING STANDARDS CODE 4 M100 OVERALL PLANS 1/4"=1' GIN <br /> 2022 CALIFORNIA FIRE CODE L L <br /> BHP BRAKE HORSEPOWER SPEC SPECIFICATION OH HUMIDITY SENSOR 5 M200 ENLARGED PLANS <br /> BMS BUILDING MANAGEMENT SYSTEM SQ.FT. SQUARE FOOT ACE MEP GROUP,INC. <br /> BTU BRITISH THERMAL UNIT SS STAINLESS STEEL OR SPLIT �M AUTOMATIC DAMPER(ELECTRIC) 6 MD01 MECHANICAL DETAILS N/A 9241 IRVINE BLVD.,SUITE 250 <br /> SYSTEM FAN COIL <br /> OiA 0 <br /> BTUH BTU PER HOUR AUTOMATIC DAMPER(PNEUMATIC) 951.808 f040 COf1l <br /> °C DEGREES CENTIGRADE(CELSIUS) <br /> MR <br /> CBC CALIFORNIA BUILDING CODE SSG SIDEWAY SUPPLY GRILL P9 P <br /> FIRE DAMPER SCOPE OF WORK <br /> CC COOLING COIL TEMP TEMPERATURE <br /> CD CEILING DIFFUSER COMBINATION FIRE SMOKE DAMPER(CFSD)TS TEMPERATURE SENSOR PROVIDE 1 TO 1 MINI-SPLIT SYSTEM FOR N.E.R.ROOM WITHIN A BANK. <br /> CD CONDENSATE DRAIN <br /> —BDD BACK DRAFT DAMPER <br /> CFC CALIFORNIA FIRE CODE TG TRANSFER GRILL �t1 AM BN <br /> CFM CUBIC FOOT/FEET PER MINUTE TV TURNING VANES MANUAL VOLUME DAMPER of wasH�N oF2 <br /> CFSD COMBINATION FIRE/SMOKE DAMPER y <br /> TYP TYPICAL <br /> CG CEILING GRILLE SMOKE DETECTOR <br /> UON UNLESS OTHERWISE NOTED <br /> CHWP CHILLED WATER PUMP ? 22025035 cp <br /> SUPPLY DUCT UP OF FFGISTE$ <br /> CHWR CHILLED WATER RETURN UTR UP THROUGH ROOF ��`r <br /> CHWS CHILLED WATER SUPPLY VOLTS <br /> SUPPLY DUCT DOWN IONAL L�Gl <br /> CLG CEILING VAV VARIABLE AIR VOLUME <br /> CMC CALIFORNIA MECHANICAL CODE EXHAUST DUCT UP <br /> COND CONDENSATE VD VOLUME DAMPER REVISION <br /> CONN CONNECTION VENT VENTILATION AIR EXHAUST DUCT DOWN <br /> CONT CONTINUATION W WIDTH RETURN DUCT UP <br /> CR CEILING RETURN W/V WITH SCOPE GAPS <br /> CU FT CUBIC FEET W/O WITHOUT C RETURN DUCT DOWN <br /> CU IN CUBIC INCHES WB WET BULB FLEXIBLE DUCTWORK,FLEXIBLE EQUIPMENT CONNECTION,DOUBLE LINE PROJECT NO:24115 <br /> 1. CONTRACTOR IS RESPONSIBLE TO REVIEW ALL ENGINEERING PLANS& DOCUMENTS BEFORE 8 <br /> ON DOWN WC WATER COLUMN AFTER APPROVAL OF THE ENGINEERING PLANS BY THE CITY&SHALL REVIEW ALL <br /> u "FOR-CONSTRUCTION-SET(S)&GMP SET(S)TO MAKE SURE ALL SCOPE&ALL CODE REQUIRED <br /> DWG DRAWING WG WATER GAUGE 1 1 DIRECTION OF FLOW ELEMENTS OF THE PROJECT ARE ACCOUNTED FOR. DATE:05/13/2024 <br /> EA EXHAUST AIR I>� I> <br /> 2. CONTRACTOR IS RESPONSIBLE TO REVIEW: <br /> EAT ENTERING AIR TEMPERATURE - ALL ENGINEERING PLANS&DOCUMENTS PRIOR TO BID,PURCHASE,&ORDER ANY MEP EQUIPMENT& DRAW BY: <br /> EDB ENTERING DRY BULB TEMPERATURE -B" DUCT SIZE,WHERE FIRST DIMENSION IS VISIBLE DUCT ON PLAN MATERIAL. <br /> CONTRACTOR SHALL PROVIDE PRE-BID RFI(S)&SUBMITTAL(S)FOR PROPER SCOPE&BUDGETING <br /> EES ENERGY EFFICIENCY STANDARD(TITLE 24) PURPOSES. CHECK BY: <br /> EF EXHAUST FAN - ANY DESIGN QUESTIONS,CLARIFICATION ITEM($),CONCERNS ON PROVIDED ENGINEERED PLANS <br /> EL ELEVATION DUCTWORK,DOUBLE LINE SHALL BE BROUGHT TO ACE PRIOR TO BIDDING. <br /> SCALE: <br /> ELEC ELECTRICAL 3. CONTRACTOR IS RESPONSIBLE TO REVIEW ALL PLANS&DOCUMENTS FROM OTHER DISCIPLINES FOR <br /> ENT ENTERING <br /> ACOUSTICAL LINED DUCTWORK,DOUBLE LINE SIZE SHOWN INDICATES NET INSIDE ANY CONFLICTS&SCOPE GAPS PRIOR TO BID,PURCHASING,&CONSTRUCTION OF THE PROJECT. <br /> DIMENSION 4. CONTRACTOR SHALL PROVIDE: <br /> EQPM EQUIPMENT <br /> - SUBMITTAL(S)TO ACE ONCE ALL RELEVANT TRADES REVIEW IS FINALIZED&STAMPED. <br /> ESP EXTERNAL STATIC PRESSURE - SUBMITTAL(S)THAT DO NOT INCLUDE GENERAL CONTRACTOR'S REVIEWED&APPROVED STAMPED <br /> DUCTWORK,SINGLE LINE WILL NOT BE SCHEDULED BY ACE FOR REVIEW. <br /> EWB ENTERING WET BULB TEMPERATURE CONTRACTOR WILL BE RESPONSIBLE FOR ANY POSSIBLE DELAYS&DAMAGES TO THE PROJECT <br /> EWT ENTERING WATER TEMPERATURE ACOUSTICAL LINED DUCTWORK,SINGLE LINE SIZE SHOWN INDICATES NET INSIDE DIMENSION CONSTRUCTION COSTS&SCHEDULES DUE TO IMPROPER SUBMITTAL(S). <br /> EXH EXHAUST <br /> °F DEGREES FAHRENHEIT <br /> FUTURE FAN COIL,DUCTED <br /> FD <br /> FD FIRE DAMPER <br /> FF FINAL FILTER <br /> FLA FULL LOAD AMPERES ui <br /> FLR FLOOR ----MA- -/WM► CEILING SUPPLY DIFFUSER WITH 4-WAY BLOW PATTERN <br /> FLX FLEXIBLE CONNECTION <br /> FPM FEET PER MINUTE <br /> FPS FEET PER SECOND -AV— ® � CEILING RETURN REGISTER N <br /> GA GAUGE ` 700 <br /> GAL GALLON /\ L <br /> GC GENERAL CONTRACTOR w <br /> CEILING EXHAUST GRILL <br /> GPH GALLON PER HOUR W <br /> GPM GALLON PER MINUTE LNL <br /> H HEIGHT 0 <br /> HC HEATING COIL ' <br /> HHWS HEATING HOT WATER SUPPLY u\i w <br /> HHWR HEATING HOT WATER RETURN Z W <br /> 1 <br /> HS HUMIDITY SENSOR <br /> w L LENGTH a <br /> (L) LINED DUCTWORK M LLI <br /> EAT LEAVING AIRTEMPERATURE 1 1 1 <br /> LBS POUNDS <br /> LDS LEAVING DRY BULB TEMPERATURE / 1 <br /> LIN FT LINEAR FEET v, <br /> LVG LEAVING <br /> LWB LEAVING WET BULB TEMPERATURE <br /> LWT LEAVING WATER TEMPERATURE <br /> MAX MAXIMUM <br /> MB MIXING BOX <br /> MBH THOUSAND BTU PER HOUR <br /> MIN MINIMUM <br /> NIC NOT IN CONTRACT SHEET TITLE: <br /> NTS NOT TO SCALE <br /> OSA/OA OUTSIDE AIR <br /> OD OUTSIDE DIAMETER <br /> POC POINT OF CONNECTION <br /> POD POINT OF DISCONNECTION NOTES, SYMBOLS, & <br /> RA RETURN AIR <br /> ABBREVIATIONS <br /> RG RETURN GRILLE <br /> RH REHEAT COIL <br /> RM ROOM <br /> RPM REVOLUTIONS PER MINUTE <br /> SHEET NUMBER: <br /> M001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.