My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6200 12TH DR SE 2024-10-14
>
Address Records
>
12TH DR SE
>
6200
>
6200 12TH DR SE 2024-10-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2024 2:13:44 PM
Creation date
9/30/2024 11:16:47 AM
Metadata
Fields
Template:
Address Document
Street Name
12TH DR SE
Street Number
6200
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Commissioning Plan Page 15 <br /> 4. Provide dates when authorities having jurisdiction (AHJ) testing will be <br /> conducted. <br /> 5. Provide submittals of shop drawings as specified. Include complete detailed <br /> sequences of operation for each piece of equipment, regardless of the <br /> completeness and clarity of the sequences in the specifications. <br /> 6. Review design for provision of power connections to the all building systems, <br /> including systems to be commissioned. <br /> 7. Review design for provision of fire alarm connections to the all building systems, <br /> including systems to be commissioned. <br /> 8. Review CA-provided blank pre-functional performance tests (PFPTs) and <br /> functional performance tests (FPTs) for accuracy and conformance to installed <br /> and programmed electrical systems. Provide review comments for the CA to <br /> update PFPTs and FPTs as necessary for accurate test forms. <br /> 9. Provide factory recommended field test procedures to the Contractor per each <br /> piece of equipment. <br /> 10. Perform start-up and testing of electrical, ATS, generator, and respective control <br /> equipment and systems. Verify the completion of all start-up activities and <br /> document as required with start-up reports and applicable documentation as <br /> required to confirm completion of systems readiness for start of commissioning <br /> activities. <br /> 11. Provide factory testing reports to Contractor before start-up of equipment. <br /> 12. Provide typical installation inspections and adequate access, to be completed by <br /> the electrical contractor, including but not limited to the following: <br /> a) Installation of electrical distribution. <br /> b) Installation of lighting controls, daylight dimming controls, and adequate <br /> access. <br /> c) Installation of all controllers and panels. <br /> d) Installation of all cable and conduit systems, control sensors and devices. <br /> e) Startup and manufacture testing of electrical equipment. <br /> f) Programming of all controllers, panels, alarms, and reports. <br /> 13. Document and submit executed pre-functional performance tests (PFPTs) 1 <br /> week minimum prior to scheduled functional performance testing (FPTs)with CA. <br /> 14. Provide all project preparation, setup, and support during execution of <br /> commissioning PFPTs and FPTs. As applicable to specific tests, disconnect <br /> electrical terminations for verification of meggar, grounding, etc., and reconnect <br /> terminations as applicable for verification of voltage, torque, etc. <br /> 15. Provide access to permit the CA to directly observe the performance of the <br /> equipment being started up and tested by third party vendors. <br /> 16. Return systems to normal conditions after commissioning PFPTs and FPTs. <br /> Upon completion of inspection, testing, PFPTs, FPTs, or similar services, repair, <br /> restore, and protect systems exposed by or for quality control activities. <br /> 17. Complete sensor calibration and control system tests to ensure system is <br /> functioning correctly. Program and test all control sequences. Create and <br /> program all required schedules, alarms and reports. <br /> 18. Place equipment and systems into automatic operation and continuing the <br /> operation during each working day of CX process, as required. <br /> 19. Provide all project preparation, setup, and support during execution of <br /> commissioning, including but not limited to units started and safeties tested prior <br /> to using equipment for testing, and any additional support as coordinated in <br /> meetings. Provide assistance of generator startup vendor as appropriate. <br /> Clare's Place Ventilation Revision <br /> IV Neudorfer Engineers, LLC. Page 15 of 68 Everett, WA <br />
The URL can be used to link to this page
Your browser does not support the video tag.