Commissioning Plan Page 18 <br /> a) Installation of equipment and adequate access. <br /> b) Installation of air and water distribution and terminal unit devices. <br /> c) Installation of duct and piping systems. <br /> d) Installation of all controllers and panels, <br /> e) Installation of all cable and conduit systems, control sensors and devices. <br /> f) Startup and manufacture testing of air and water moving or controlling <br /> equipment and water treatment systems. <br /> g) Programming of all controllers, panels, alarms, reports, and data trends. <br /> 10. Include the cost of replacing sheaves and belts that may be required by TAB. <br /> 11. Provide test holes in ducts and plenums where directed by TAB to allow air <br /> measurements and air balancing. Provide plugs for all TAB test holes. <br /> 12. Provide temperature and pressure taps according to the Construction <br /> Documents for TAB and CX testing. <br /> 13. Document and submit executed pre-functional performance tests (PFPTs) 1 <br /> week minimum prior to scheduled functional performance testing (FPTs)with CA. <br /> 14. During startup, complete a full point-to-point test, sensor calibration and control <br /> system tests to ensure system is functioning correctly. Program and test all <br /> control sequences. Create and program all required schedules, alarms and <br /> reports. <br /> 15. Assist and cooperate with the TAB contractor in the following manner: <br /> a) Meet with the TAB contractor prior to beginning TAB and review the TAB <br /> plan to determine the capabilities of the control system toward completing <br /> TAB. Provide the TAB any needed unique instruments for setting terminal <br /> unit boxes and instruct TAB in their use. <br /> b) Provide a qualified technician to operate the controls to assist the TAB <br /> contractor in performing TAB, or provide sufficient training for TAB to <br /> operate the system without assistance. <br /> 16. Perform mechanical testing. Assist and be available on site for TAB activities. <br /> 17. Assist the CC with performance verification testing (PVT) of equipment and <br /> systems as defined in contract documents to confirm completion of mechanical <br /> systems readiness for start of commissioning activities. <br /> 18. Place equipment and systems into automatic operation and continuing the <br /> operation during each working day of CX process, as required. <br /> 19. Operate the mechanical equipment and system as required for Functional <br /> Performance Testing. Provide a qualified representative to assist the <br /> commissioning team in performing all tests including verification for sequence of <br /> operation, alarm generation, shutdowns for local and remote annunciation, <br /> protective features, all normal and abnormal failure conditions. <br /> 20. Participate in the fine-tuning or troubleshooting of the system performance if <br /> either of these measures becomes necessary. <br /> 21. Provide complete operation and maintenance information and `As-Built" drawings <br /> to the general contractor and CA for verification, organization and distribution. <br /> 22. Provide a qualified technician to perform owner training for the mechanical <br /> systems. <br /> I. Plumbing Contractor's Responsibilities (PC) <br /> 1. Prepare a schedule for pipe system testing, flushing & cleaning, equipment start <br /> up and TAB start & completion. Update the schedule as appropriate and notify <br /> the CA ahead of time when commissioning activities are not yet performed or if <br /> scheduling will delay construction. <br /> Clare's Place Ventilation Revision <br /> IV Neudorfer Engineers, LLC. Page 18 of 68 Everett, WA <br />