My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6200 12TH DR SE 2024-10-14
>
Address Records
>
12TH DR SE
>
6200
>
6200 12TH DR SE 2024-10-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2024 2:13:44 PM
Creation date
9/30/2024 11:16:47 AM
Metadata
Fields
Template:
Address Document
Street Name
12TH DR SE
Street Number
6200
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Commissioning Plan Page 26 <br /> 14. Review and provide comments on contractor submittals to ensure sufficient <br /> clarity and detail, and that the system will be functional and reliable. <br /> a) TAB execution plan /agenda. <br /> b) Blank contractor start-up checklist forms. <br /> c) Controls PVT plan. <br /> d) System startup tests performed by contractor through verification of startup <br /> procedures or through direct observation of startup tests, as detailed in the <br /> commissioning plan. <br /> e) Controls point-to-point checkouts. <br /> f) Controls PVT reports. <br /> g) Controls calibrations. <br /> h) Controls trend logs. <br /> i) TAB preliminary report. <br /> j) TAB final report. <br /> 15. Develop and write PFPT and FPT procedures for all equipment tests, and <br /> systems and cross-systems tests required by the Contract Documents. Test <br /> procedures shall be in accordance with equipment manufacturer's <br /> recommendations, where applicable. Test procedures shall fully describe the <br /> equipment or system configuration and steps required for each test. The <br /> procedures shall be appropriately documented so that another party can repeat <br /> the identical test. Confirm testing criteria with A/E. <br /> 16. Maintain separate M&E systems "Commissioning Binders," indexed and tabbed <br /> according to the equipment or systems requiring commissioning, to compile the <br /> start-up and FPT documentation. The binders shall be on-site during the work. <br /> a) Prior to testing, confirm that applicable Subcontractors and manufacturer's <br /> representatives have reviewed the test and commissioning documentation <br /> to identify personnel safety issues, equipment protection issues, and to <br /> validate relevance to the actual equipment provided. <br /> b) Maintain a set of drawings for recording the sign-off of each component of <br /> the plumbing and piping system pressure testing, heating, ventilation, and <br /> air conditioning (HVAC) system duct work pressure testing, and the <br /> completed flushing/cleaning and treatment activities. <br /> c) Populate the initial binders with approved blank start-up forms. As tests are <br /> executed, replace blank forms with completed forms to be submitted in final <br /> M&E systems Commissioning Binders, as a requirement of Final <br /> Completion. <br /> 17. Review system startup tests performed by contractor through verification of <br /> startup procedures or through direct observation of startup tests, as detailed in <br /> the commissioning plan. <br /> 18. Inspect installation to observe quality and check conformance to the Cx <br /> requirements. Lead Cx site visits and meetings to support the installation of the <br /> equipment and Functional Performance Testing schedule. <br /> 19. Back check TAB for reading repeatability on a sampling basis as dictated by CA. <br /> 20. Schedule Cx site visits and meeting to support the installation of the equipment <br /> and Functional Performance Testing schedule. <br /> 21. Maintain documentation including deficiency and resolution log and Cx request <br /> for information; testing and systems readiness checklist procedures. <br /> 22. Witness selected static tests and equipment startups. <br /> 23. Verify control component calibration. <br /> Clare's Place Ventilation Revision <br /> IV Neudorfer Engineers, LLC. Page 26 of 68 Everett, WA <br />
The URL can be used to link to this page
Your browser does not support the video tag.