My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6200 12TH DR SE 2024-10-14
>
Address Records
>
12TH DR SE
>
6200
>
6200 12TH DR SE 2024-10-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2024 2:13:44 PM
Creation date
9/30/2024 11:16:47 AM
Metadata
Fields
Template:
Address Document
Street Name
12TH DR SE
Street Number
6200
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Commissioning Plan Page 27 <br /> 24. Witness Functional Performance Testing of systems and equipment and <br /> recommend approval as applicable when Functional Performance Testing <br /> requirements are met. <br /> 25. Optimize system settings as practical during Functional Performance Testing. <br /> 26. Witness, verify, and approve satisfactory completion of equipment, systems and <br /> cross-systems FPT, based upon the Contract Documents requirements. <br /> 27. Obtain the signature of the designated witness on all data forms. If the witness is <br /> unavailable at the scheduled time and location of the activity, so note, and <br /> proceed per schedule without witness. <br /> 28. Review for accuracy, comment on, and approve specified close-out <br /> documentation, including O&M manuals of equipment and systems included in <br /> commissioning scope. Report any discrepancies to the GC and Owner. <br /> 29. Assist the GC with coordination of training materials and training agendas. <br /> 30. Submit final commissioning report and respective documentation. Revise as <br /> necessary per Cx team review comments. <br /> 31. Recommend Substantial Completion when commissioning and training has been <br /> successfully completed. <br /> 32. Coordinate any deferred FPT tests. <br /> 33. Issue addenda to final commissioning report as applicable. <br /> IV. CX PROTOCOLS <br /> A. Cx Coordination <br /> 1. CA shall solicit participation of the appropriate parties and ensure that the tasks <br /> are being executed and responsibilities are being met. <br /> 2. CA shall report progress of the Cx to the Owner and CM/GC. <br /> 3. A/E shall notify CA of all design review or other key meetings relative to the CA's <br /> scope of work at least two weeks in advance. <br /> B. Sampling <br /> 1. The CA develops a sampling strategy, agreed upon by the Cx Team, when <br /> multiple identical pieces of non-life-safety or non-critical equipment may be <br /> functionally tested. <br /> 2. 20% Sampling — 10% Failure Rule will be utilized: <br /> a) Randomly test 20% of identical equipment. The first 20% tested, constitute <br /> the first sample. <br /> b) If 10% of units in the first sample fail, test another 20% of the group. <br /> c) If 10% of units in the second sample fail, test all remaining units in group. <br /> d) If at any point, frequent failures are occurring, and testing is becoming more <br /> troubleshooting than verification, the CA may stop the testing and require <br /> the contractor to perform and document a checkout of the remaining units, <br /> prior to continuing with testing of the remaining units. <br /> C. Communication Protocols Relating to Cx <br /> 1. Correspondence shall generally be routed directly between corresponding <br /> companies with copies going to all parties of the Cx Team. The primary <br /> exception to this is when it relates to a work directive. <br /> 2. No communication from the CA shall be interpreted as a work directive. All <br /> channels for directing work are dictated in the contract documents and the <br /> Clare's Place Ventilation Revision <br /> IV Neudorfer Engineers, LLC. Page 27 of 68 Everett, WA <br />