My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BCE Engineers, Inc. 10/11/2024 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
BCE Engineers, Inc. 10/11/2024 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2024 4:06:52 PM
Creation date
10/11/2024 4:04:51 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
BCE Engineers, Inc.
Approval Date
10/11/2024
Council Approval Date
10/9/2024
End Date
6/30/2025
Department
Transportation Services
Department Project Manager
Brad Chenoweth
Subject / Project Title
Cabinet Charging Infrastructure at Public Works
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0004003
Total Compensation
$174,549.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
BCE Engineers, Inc. 11/3/2023
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
EV Charger Addition – South Site Page 2 <br />BCE Engineers, A Division of TranSystems | 6021 12th St. East, Suite 200 | Fife, Washington 98424 P 253.922.0446 <br />Permit (90%) – Final design with all applicable detailing and calculations for a plan review submittal to the City of <br />Everett. Includes CSI specifications for applicable disciplines. <br />Construction Documents (100%) – Bid-ready documents, including plans and specifications. <br />Bidding assistance is included for the following items: (1) precon site walk with Transit personnel and prospective <br />contractors, pre-Bid RFI responses and associated addendums. <br />Construction assistance is included for the following items: submittal reviews (product and O&Ms), design <br />clarifications, RFI responses, Change Order reviews, and as-built drafting of field changes. We have also included <br />up to (3) site walks during construction to review installed conditions. Three (3) teleconferences are also included <br />as necessary to address any field questions. <br />Specific Scope Assumptions and Exclusions: <br />-Division 01 Specifications will be provided by Everett Transit <br />-Bid Advertisement and management of the bidding process will be by Everett <br />-Chargers and associated accessories (ie. Power Boxes) will be purchased separately by COE Transit and <br />turned over to the Contractor for installation <br />We propose to perform the above services for the following fees: <br />Electrical (Hourly NTE): $ 21,900 <br />Civil (Fixed): $ 59,500 <br />Survey (Fixed and Reimburse): $ 9,000 <br />Landscape (Fixed and Hourly): $ 31,900 <br />Geotechnical (Fixed): $ 11,075 <br />Markup (5%): $ 5,574 <br />Total: $138,949 <br />Again, thank you for the opportunity to submit a proposal for this project. If you have any questions, please do not <br />hesitate to call. <br />Sincerely, <br />BCE ENGINEERS <br />Ben Hedin, PE <br />Principal
The URL can be used to link to this page
Your browser does not support the video tag.