<br />City reimburse the Contractor for charges caused by delays unless prior written authorization is <br />provided by the City. <br />10.3 Job Order Price <br />The Job Order Price constitutes the total compensation subject to authorized adjustments payable <br />to Contractor for performing the Detailed Scope of work. All duties, responsibilities and <br />obligations assigned to or undertaken by Contractor shall be at its expense without change in the <br />Job Order Price. <br />Contractor Mobilization consists of preconstruction expenses and costs of preparatory work and <br />operations performed by the Contractor that are not defined as a part of a payment item are <br />considered to be part of the Job Order Price. <br />10.4 Job Order Completion Time <br />Any extension of Job Order Completion Time must have the written approval of the City and must <br />conform to the procedures set forth here. <br />In event of delay in completion of the Work caused by acts of God, or the public enemy, or <br />another contractor in the performance of a contract with the City, or caused by fires, floods, <br />epidemics, quarantine restrictions, strikes, freight embargoes or weather, the sole and exclusive <br />remedy of the Contractor will be an equitable extension of time allowed for completion. <br />Reasonable Delays. The Contractor should anticipate that some reasonable delays, including those <br />caused by normal weather patterns, may occur. The Contractor shall not be entitled to any <br />compensation, damages, or extension of the Contract Time for such reasonable delays. <br />Excusable Delays. The Job Order Completion Time may be extended without compensation by the <br />City for a period equivalent to the time that the Contractor was delayed in the Work by one or more <br />of the following causes, beyond the control of the City and the Contractor, occurring during the <br />performance of the Work: <br />a. Fire or other casualty for which the Contractor is not at fault or otherwise <br />responsible; <br />b. Strike, riot, war, or civil disorder; <br />c. Suspension of Work due to unusual and severe weather; <br />d. Suspension of Work due to other unsuitable conditions in accordance with Article 13.