My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Forma Construction Company 10/29/2024
>
Contracts
>
Job Order Contracting
>
Job Order Contracting
>
Forma Construction Company 10/29/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2024 9:37:26 AM
Creation date
10/29/2024 9:35:31 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Forma Construction Company
Approval Date
10/29/2024
Council Approval Date
10/23/2024
Department
Procurement
Department Project Manager
Theresa Bauccio-Teschlog
Subject / Project Title
Job Order Contracting for General Construction Services
Tracking Number
0004561
Total Compensation
$4,000,000.00
Contract Type
Job Order Contracting
Contract Subtype
Job Order Contracting
Retention Period
6 Years Then Destroy
Imported from EPIC
No
该页面上没有批注。
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />City reimburse the Contractor for charges caused by delays unless prior written authorization is <br />provided by the City. <br />10.3 Job Order Price <br />The Job Order Price constitutes the total compensation subject to authorized adjustments payable <br />to Contractor for performing the Detailed Scope of work. All duties, responsibilities and <br />obligations assigned to or undertaken by Contractor shall be at its expense without change in the <br />Job Order Price. <br />Contractor Mobilization consists of preconstruction expenses and costs of preparatory work and <br />operations performed by the Contractor that are not defined as a part of a payment item are <br />considered to be part of the Job Order Price. <br />10.4 Job Order Completion Time <br />Any extension of Job Order Completion Time must have the written approval of the City and must <br />conform to the procedures set forth here. <br />In event of delay in completion of the Work caused by acts of God, or the public enemy, or <br />another contractor in the performance of a contract with the City, or caused by fires, floods, <br />epidemics, quarantine restrictions, strikes, freight embargoes or weather, the sole and exclusive <br />remedy of the Contractor will be an equitable extension of time allowed for completion. <br />Reasonable Delays. The Contractor should anticipate that some reasonable delays, including those <br />caused by normal weather patterns, may occur. The Contractor shall not be entitled to any <br />compensation, damages, or extension of the Contract Time for such reasonable delays. <br />Excusable Delays. The Job Order Completion Time may be extended without compensation by the <br />City for a period equivalent to the time that the Contractor was delayed in the Work by one or more <br />of the following causes, beyond the control of the City and the Contractor, occurring during the <br />performance of the Work: <br />a. Fire or other casualty for which the Contractor is not at fault or otherwise <br />responsible; <br />b. Strike, riot, war, or civil disorder; <br />c. Suspension of Work due to unusual and severe weather; <br />d. Suspension of Work due to other unsuitable conditions in accordance with Article 13.
The URL can be used to link to this page
Your browser does not support the video tag.