Laserfiche WebLink
Sister upgrade is required for (MP1) on all <br /> rafters that directly support solar PV and that BLUE RAVEN <br /> have horizontal spans that exceed 9'-6". <br /> 1403 N. Research Way <br /> Orem, LIT 84097 <br /> 800.377.4480 <br /> W W W.BLUERAVENSOLAR.COM <br /> 1X DECKING OR SHEATHING CONFIDENTIAL-THE INFORMATION <br /> HEREIN CONTAINED SHALL NOT BE <br /> USED FOR THE BENEFIT OF ANYONE <br /> (N) :NSTALL SYAPSON A34 CLIP EXCEPT BLUE RAVEN SOLAR NOR <br /> SHALL IT BE DISCLOSED IN WHOLE OR <br /> IN PART TO OTHERS OUTSIDE <br /> RECIPIENTS ORGANIZATION,EXCEPT <br /> (E) RAFTERS IN CONNECTION WITH THE SALE AND <br /> (N) SISTER MEMBER TO BE FULL USE OF THE RESPECTIVE EQUIPMENT, <br /> INSTALL END GROUP OF LENGTH,ATTAC14 TO(E)RAFTER We WITHOUT THE WRITTEN PERMISSION <br /> FASTENERS W THIN 6'Ot T43'WOOD SCREWS STAGGERED OF BLUE RAVEN SOLAR LLC. <br /> EACH END(3)SCREWS►A N TOP AND BOTTOM 1B-O.C. <br /> NABCEP <br /> (E) CEILING JOIST C E RT I F I E D <br /> SISTER TO BE WITHIN 3'OF PV INSTALLATION <br /> TOP OF CEILING JOIST OB <br /> TOP OF WALL PROFESSIONAL <br /> Scott Gurney <br /> OPTION 1 - FULL LENGTH SISTER #PV-011719-015866 <br /> SEE LETTER FOR UPGRADE LAP LENGTH AND SZE CONTRACTOR: <br /> BRS FIELD OPS <br /> 800-377-4480 <br /> I DECKING OR SHEATHING <br /> (N) INSTALL SWDSON A34 CLIP U <br /> Sealed For Q> CD <br /> Q <br /> Z >(E) RAFTERS (NI SISTER MEMBER TO BE FULL <br /> 1 FNGTH.ATTACH TO(F1 RAFTER W1 Existing Roof& O �. � <br /> LID <br /> INSTALL ENO GROUP OF }'x3'WOOD SCREWS STAGGERED M Lo <br /> FASTENERS WITH fI!'OF TOP AND BOTTOM 1E'0C Attachment Only Q <br /> EACH END.(3)SCREWS MIN C: <br /> > O N cM <br /> LU <br /> 0) Lii Lii <br /> OL > Z N N4 <br /> (EI CEIUNGJOIST CIO <br /> C Z � CN � <br /> S STER TO BE WITHIN OF A` w 0 — � c M J' <br /> TOP Or CE IL ING JOIST OR WW �_ <br /> TOP OF WALL �� �Y G 0) <br /> OPTION 2 - OVERLAPPED SISTER .a O a c0 ui <br /> SEE LETTER FOR UPGRADE LAP LENGTH AND SIZE / N C E 0� N <br /> (N) SISTER RAFTER w <br /> > U U <br /> 460S <br /> � 1�,�FCJ � ��V� DRAWING BY: <br /> (N) SISTERRN-TER J`-•-� (EI RAFTER SS�O�AE '�' PremiumCAD <br /> SECTION A-A <br /> PLOT DATE: <br /> S1 SISTER UPGRADE OPTIONS March 13, 2023 <br /> ALTERNATIVE FASTENER SCHEDULE: 10d NAILS STAGGERED TOP AND BOTTOM AT 6'O.C. 3/13/23 PROJECT NUMBER: <br /> 722401 <br /> SHEET NAME: <br /> STRUCTURAL <br /> REVISION: PAGE NUMBER: <br /> 0 PV4 <br />