Deliverables: <br />• 30% construction plans (22”x34”) in electronic PDF format. <br />Construction drawings will include a cover sheet, legends and abbreviations sheet, plan and profile, <br />traffic control plan, constructions notes and details sheet and site restoration sheet. The approximate <br />sheet count will be as follows: <br /> 1 cover sheet <br /> 1 legend and abbreviations sheet <br /> 1 general notes sheet <br /> 1 survey control sheet <br /> 6 stormwater conveyance/grading plan and profile sheets <br />• Preliminary cost estimate including material quantity calculation spreadsheets in electronic Microsoft <br />Excel and PDF format <br />Assumptions: <br />• The City will provide the contract documents for inclusion in the project manual. <br />• One (1) round of City review and comment preliminary plans and cost estimate if any, to be <br />incorporated in the intermediate design. If additional rounds of review are performed an additional <br />services agreement may be required. <br />• The design of the future water quality facilities will not advance to the 60%, 90% or final design <br />stages, <br />TASK 500 –HYDRAULIC MODELING <br />An SRH-2D model will be developed by PACE to model the existing and proposed conditions for a series of <br />flow events to analyze how the stream reacts to different flow events. This information will include but is <br />not limited to flow depths, velocity, water surface elevation, and shear stress. This information will then <br />be applied to various subsequent analyses, such as scour, to ensure state standards and requirements are <br />being met. <br />Deliverables <br />PACE will provide the following deliverables: <br />• A packaged SMS SRH-2D model <br />• SMS SRH-2D model results (to be incorporated into the Design Report) <br />Assumptions: <br />• The existing unnamed stream is fish bearing and the existing culvert across West Marilyn Avenue is <br />considered a fish barrier <br />• The crossing structure will be a modular concrete buried structure built offsite. <br />• The City will provide any SWMMM files for PACE to utilize in order to update any of the <br />hydraulic/hydrologic modeling and analysis. <br />• City to provide previous modeling effort including basin delineation. <br /> <br />TASK 600 –CONCEPTUAL CULVERT AND STREAM PLANS/DESIGN REPORT <br />PACE will develop two conceptual design alternatives for the crossing structures. Due to the limited cover <br />present at the culvert crossing the anticipated analysis will compare a 3-sided concrete box culvert <br />against a 4-sided concrete box culvert. The design alternatives will define the crossing lengths, widths, <br />and structure alternatives. The alternatives, which will account for high level cost considerations, will be <br />presented at an Alternatives Selection meeting. PACE will define a preferred alternative within these