Laserfiche WebLink
 1 survey control sheet <br /> 6 temporary erosion and sediment control sheet/demolition sheets <br /> 8 stormwater conveyance/grading plan and profile sheets <br /> 1 culvert plan and profile sheet <br /> 2 stream channel restoration sheets <br /> 4 paving and restoration plan sheets <br /> 3 project detail sheets <br /> 2 culvert detail sheets <br /> 4 planting plan sheets <br /> 4 traffic control plan sheets <br />• 60% cost estimate including material quantity calculation spreadsheets in electronic Microsoft Excel <br />and PDF format. <br />• A 60% project manual including technical specifications in electronic Microsoft Word and PDF format. <br />The project will use WSDOT/APWA standard specification formatting. <br />Assumptions: <br />• The City will provide the contract/bidding documents for inclusion in the project manual. <br />• One (1) round of City review and comment preliminary plans and cost estimate, if any, to be <br />incorporated in the intermediate design. If additional rounds of review are performed, an additional <br />services agreement may be required. <br />• Based on assumption of precast concrete structures to be used, PACE Structural Engineers will <br />provide prescriptive performance specifications for the structure but will not provide structural <br />drawings. The construction contractor will be responsible for procuring the structure and providing <br />shop drawings for the engineers review during the construction phase. <br />• The design of the future water quality facilities is not included in this task and will not be included in <br />the submittal. <br />TASK 800 –90% DESIGN PACKAGE PRODUCTION <br />Under this task, PACE will complete the 90% design package upon receipt of City review comments on the <br />60% submittal package. It is anticipated that the 90% plan set (see page list below), estimate of probable <br />construction cost, technical specifications, and construction stormwater pollution prevention plan <br />(CSWPPP) will be updated and provided under this task. <br />Specific to the culvert replacement and stream channel restoration, PACE will update the design based on <br />comments received by the City. The design plans will also include clearing limits, landscape restoration <br />plan, stream bypass plan, paving plan, temporary erosion control, and any other site-specific required <br />detail. The landscape plans will identify vegetation types in areas of restoration and will include a <br />candidate plant list of naturally occurring plant community species. Planting design will be strategic as to <br />provide structural and species diversity, adequate shade, and bank stabilization. <br />Deliverables <br />PACE will provide the following deliverables: <br />• 90% design plans (11”x17”) in electronic PDF format. It is anticipated that the following sheets will be <br />included in the 90% plan set: <br /> 1 cover sheet <br /> 1 legend and abbreviations sheet <br /> 1 general notes sheet <br /> 1 survey control sheet