My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Otak, Inc. 11/13/2024
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Otak, Inc. 11/13/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2025 4:33:18 PM
Creation date
11/14/2024 11:19:18 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Otak, Inc.
Approval Date
11/13/2024
Council Approval Date
11/6/2024
End Date
12/31/2025
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Dorn Avenue Drainage Improvements
Tracking Number
0004584
Total Compensation
$731,847.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Otak, Inc. 12/18/2025 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Scope of Work <br />continued <br />City of Everett 3 <br />Dorn Ave. Drainage Improvements Otak <br />1.3 Design Coordination Meetings with the City <br />Coordination meetings will be held with City staff to review the 30%. 60%, 90% and 100% submittals. It is <br />assumed that meetings will be held virtually by video conference or in person. The meetings are assumed <br />to be up to 1.5 hours in length. Attendance will generally include Otak’s project manager and designer <br />along with designated City staff. The meetings are anticipated to include the following: <br />· 30% plan review <br />· Review of City comments for the 60%, 90% and 100% plan review including cost estimate review. <br />90% review will include the specifications. <br /> <br />1.4 Project Monitoring and Reporting <br />Project monitoring and reporting will include the coordination of design team members, internal project <br />scheduling, and the preparation of a monthly progress report and monthly invoicing. <br />TASK 1 DELIVERABLES <br /> Weekly project status reports via email <br /> Project Management Plan Update (Draft and Final, electronic PDF file format) <br /> Project Schedule <br /> Monthly progress report and invoice to include Summary table indicating the following information for <br />each task and contract total: contract budget, prior billed, current invoice, and budget remaining. <br />TASK 1 ASSUMPTIONS <br /> Notice to proceed will occur in November with design completion anticipated by end of August 2025. <br /> Bi-weekly status meetings will be held via video conference. <br /> <br />2. Site Investigation <br />2.1 Desktop Review <br />This task will gather additional existing available information from the City on McGill Pond, pond <br />overflows, and flooding of McGill Avenue at the North Creek culvert crossing. This includes past <br />maintenance records, drainage complaints, photographs, and stormwater infrastructure drawings, as- <br />builts or surveys. <br />2.2 Site Reconnaissance <br />The team will visit the project site to confirm and verify the Solution Element 1A and 2 alignments and <br />inspect the McGill Avenue Pond site and low point. The project survey basemap will be field verified for <br />utility locations/conflicts, existing critical infrastructure, and access features. The open conveyance <br />adjacent to Dorn Avenue will be targeted to understand current safety concerns and proposed mitigation. <br />TASK 2 DELIVERABLES <br /> GIS graphic with annotation of pond infrastructure, overflow paths and McGill Ave flooding locations. <br /> Markups on survey basemap for internal use and coordination with surveyor if additional information <br />needed. <br />