My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Blue Mountain Construction Group, LLC 11/19/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Blue Mountain Construction Group, LLC 11/19/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 4:40:41 PM
Creation date
11/19/2024 11:14:18 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Blue Mountain Construction Group, LLC
Approval Date
11/19/2024
Council Approval Date
11/6/2024
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
3rd Ave Water Quality Facility
Tracking Number
0004585
Total Compensation
$610,415.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Blue Mountain Construction 9/30/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />3rd Ave Water Quality Facility Division 7 – STORM, SEWER, WATER September 12, 2024 <br />WO No. – UP 3775 SP – 172 <br />Supplement 7-04.1 as follows: <br />7-04.1(1) Submittals <br />(******) <br />Provide Type 2 Working Drawings for all materials and Standard Plans. <br />7-04.2 Materials <br />Delete the first and second paragraphs in 7-04.2 and substitute the following: <br />Materials shall meet the requirements of the following sections: <br />Reinforced Concrete Storm Sewer 9-05.7(2) Standard Specifications <br />Pipe <br />Concrete Storm Sewer 9-05.7(3) Standard Specifications <br />Pipe Joints <br />Solid Wall PVC Storm Sewer Pipe 9-05.12(1) Special Provisions <br />& Joints <br />Profile Wall PVC Storm Sewer Pipe 9-05.12(2) Standard Specifications <br />& Joints <br />Corrugated Polyethylene Storm 9-05.20 Standard Specifications <br />Sewer Pipe & Joints <br />Steel Rib Reinforced Polyethylene Storm Sewer Pipe 9-05.22 <br /> Standard Specifications <br />High-Density Polyethylene (HDPE) Pipe 9-05.23 Standard <br />Specifications <br />Polypropylene Storm Sewer Pipe 9-05.24 Standard <br />Specifications <br />Revise the last paragraph in 7-04.2 to read as follows: <br />When schedule A or B storm sewer pipe is specified in the Plans, provide the specified <br />schedule and diameter of PVC materials shown in the Storm Sewer Pipe Schedules <br />Table. <br /> <br />Contact the Olympia Service Center Materials Laboratory to determine if joints have <br />been approved for pipe diameters larger than those listed. <br />On the web at: http://www.wsdot.wa.gov/biz/mats/QPL/QPl.cfm <br />Or by mail at: <br />P.O. Box 167 <br />Olympia, WA 98507-0167 <br />(360) 709-5442 <br />7-04.4 Measurement <br />Delete the first paragraph of 7-04.4 and substitute the following: <br />Bid items of Work completed pursuant to the Contract Documents will be measured as <br />described in Division B – Bid Item Descriptions of these Special Provisions and Section <br />1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br />7-04.5 Payment <br />Delete all paragraphs in 7-04.5 and substitute the following: <br />Payment for bid items of Work completed pursuant to the Contract Documents will be <br />as described in Division B – Bid Item Descriptions of these Special Provisions and <br />Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br />7-05 MANHOLES, INLETS, AND CATCH BASINS <br />7-05.1 Description <br />Revise the first paragraph in 7-05.1 to read as follows:
The URL can be used to link to this page
Your browser does not support the video tag.