Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />3rd Ave Water Quality Facility Division 7 – STORM, SEWER, WATER September 12, 2024 <br />WO No. – UP 3775 SP – 172 <br />Supplement 7-04.1 as follows: <br />7-04.1(1) Submittals <br />(******) <br />Provide Type 2 Working Drawings for all materials and Standard Plans. <br />7-04.2 Materials <br />Delete the first and second paragraphs in 7-04.2 and substitute the following: <br />Materials shall meet the requirements of the following sections: <br />Reinforced Concrete Storm Sewer 9-05.7(2) Standard Specifications <br />Pipe <br />Concrete Storm Sewer 9-05.7(3) Standard Specifications <br />Pipe Joints <br />Solid Wall PVC Storm Sewer Pipe 9-05.12(1) Special Provisions <br />& Joints <br />Profile Wall PVC Storm Sewer Pipe 9-05.12(2) Standard Specifications <br />& Joints <br />Corrugated Polyethylene Storm 9-05.20 Standard Specifications <br />Sewer Pipe & Joints <br />Steel Rib Reinforced Polyethylene Storm Sewer Pipe 9-05.22 <br /> Standard Specifications <br />High-Density Polyethylene (HDPE) Pipe 9-05.23 Standard <br />Specifications <br />Polypropylene Storm Sewer Pipe 9-05.24 Standard <br />Specifications <br />Revise the last paragraph in 7-04.2 to read as follows: <br />When schedule A or B storm sewer pipe is specified in the Plans, provide the specified <br />schedule and diameter of PVC materials shown in the Storm Sewer Pipe Schedules <br />Table. <br /> <br />Contact the Olympia Service Center Materials Laboratory to determine if joints have <br />been approved for pipe diameters larger than those listed. <br />On the web at: http://www.wsdot.wa.gov/biz/mats/QPL/QPl.cfm <br />Or by mail at: <br />P.O. Box 167 <br />Olympia, WA 98507-0167 <br />(360) 709-5442 <br />7-04.4 Measurement <br />Delete the first paragraph of 7-04.4 and substitute the following: <br />Bid items of Work completed pursuant to the Contract Documents will be measured as <br />described in Division B – Bid Item Descriptions of these Special Provisions and Section <br />1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br />7-04.5 Payment <br />Delete all paragraphs in 7-04.5 and substitute the following: <br />Payment for bid items of Work completed pursuant to the Contract Documents will be <br />as described in Division B – Bid Item Descriptions of these Special Provisions and <br />Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br />7-05 MANHOLES, INLETS, AND CATCH BASINS <br />7-05.1 Description <br />Revise the first paragraph in 7-05.1 to read as follows: