My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Blue Mountain Construction Group, LLC 11/19/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Blue Mountain Construction Group, LLC 11/19/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 4:40:41 PM
Creation date
11/19/2024 11:14:18 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Blue Mountain Construction Group, LLC
Approval Date
11/19/2024
Council Approval Date
11/6/2024
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
3rd Ave Water Quality Facility
Tracking Number
0004585
Total Compensation
$610,415.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Blue Mountain Construction 9/30/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />3rd Ave Water Quality Facility Division 7 – STORM, SEWER, WATER September 12, 2024 <br />WO No. – UP 3775 SP – 187 <br />Use Controlled Density Fill in lieu of select trench backfill for fill above pipe zone at <br />street crossings and as directed by the Engineer in other areas where in order to <br />prevent pavement patch settlement requires high density backfill placement or <br />effective backfill compaction is not possible. <br />Delete the first sentence of the third paragraph. <br />Delete the third and fourth sentences of the fourth paragraph. <br />7-08.3(4) Plugging Existing Pipe <br />Delete the first paragraph of 7-08.3(4) and substitute the following: <br />Where shown on the plans to plug and seal existing water main, sanitary sewer and <br />storm drainage pipe plug existing pipe a minimum distance of 2-feet from the inlet <br />end with cement grout and abandon in place. <br />7-08.4 Measurement <br />Delete all paragraphs in 7-08.4 and substitute the following: <br />Bid items of Work completed pursuant to the Contract Documents will be measured as <br />described in Division B – Bid Item Descriptions of these Special Provisions and Section <br />1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br />7-08.5 Payment <br />Delete all paragraphs in 7-08.5 and substitute the following: <br />Payment for bid items of Work completed pursuant to the Contract Documents will be <br />as described in Division B – Bid Item Descriptions of these Special Provisions and <br />Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specification7-09 <br /> WATER MAINS <br />7-09 WATER MAINS <br />7-09.1 Description <br />Revise the first paragraph in 7-09.1 to read as follows: <br />This Work consists of constructing water mains in accordance with the Plans, the <br />Standard Specifications, these Special Provisions and the COE Standard Drawings, at <br />the location shown on the Plans. <br />7-09.1(1) Definitions <br />7-09.1(1)D Pipe Zone Backfill <br />Revise the first paragraph in 7-09.1(1)D to read as follows: <br />Pipe zone backfill includes material placed a minimum of 6-inches below the <br />bottom of pipe up to a minimum of 12-inches above the top of pipe as shown <br />on COE Standard Drawing No. 615. <br />7-09.2 Materials <br />Substitute the following for the corresponding material in the material list in 7-09.2: <br />Polyethylene Encasement 9.30.1(2) Special Provisions <br />Fittings 9-30.2 Special Provisions <br />Restrained Joints 9-30.2(6) Special Provisions <br />Bolted, Sleeve–Type Couplings 9-30.2(7) Special Provisions <br />for Plain End Pipe <br />Aggregates: <br />Pipe Zone Backfill 9-03.22 Special Provisions <br />Controlled Density Fill 2.09.3(1)E Special Provisions
The URL can be used to link to this page
Your browser does not support the video tag.