My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Blue Mountain Construction Group, LLC 11/19/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Blue Mountain Construction Group, LLC 11/19/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 4:40:41 PM
Creation date
11/19/2024 11:14:18 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Blue Mountain Construction Group, LLC
Approval Date
11/19/2024
Council Approval Date
11/6/2024
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
3rd Ave Water Quality Facility
Tracking Number
0004585
Total Compensation
$610,415.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Blue Mountain Construction 9/30/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />3rd Ave Water Quality Facility Division 7 – STORM, SEWER, WATER September 12, 2024 <br />WO No. – UP 3775 SP – 188 <br />7-09.3 Construction Requirements <br />7-09.3(5) Grade and Alignment <br />Revise the first sentence of the third paragraph in 7-09.3(5) to read as follows: <br />Provide minimum cover from the final surface grade to the top of the pipe of 36- <br />inches for water mains less than 12-inches in diameter and 48-inches for water <br />mains 12-inches or greater in diameter. Provide 60-inches as the maximum depth <br />from the final surface grade to the top of all water main pipes. Adhere to both <br />minimum and maximum depths from finish grades unless Plans indicate otherwise. <br />7-09.3(7) Trench Excavation <br />Revise the second paragraph in 7-09.3(7) to read as follows: <br />Excavate bell holes to the extent necessary to permit accurate Work in making and <br />inspecting the joints. Keep the banks of the trenches as nearly vertical as soil <br />conditions will permit, and where required to control trench width or to protect <br />adjacent Structures, sheet and brace the trench. Provide trench widths to 1 foot <br />above the top of the pipe in accordance with COE Standard Drawing No. 614. <br />Standard excavating equipment shall be adjusted so as to excavate the narrowest <br />trench possible. <br />7-09.3(7)A Dewatering of Trench <br />Supplement 7-09.3(7)A by adding the following: <br />Furnish, install, and operate necessary machinery, appliances, and equipment <br />to keep excavations free from water during construction. <br />Trench dewatering shall be included with the Work with no direct compensation <br />made. <br />7-09.3(8) Removal and Replacement of Unsuitable Materials <br />Delete all three paragraphs of 7-09.3(8) and substitute the following: <br />Remove Engineer classified unsuitable material at the trench bottom and replace <br />with "Foundation Material Class A or B", or other Engineer approved imported or <br />native material. <br />Replace, at Contractor’s expense, unauthorized over-excavation with Gravel <br />Borrow. Compact Gravel Borrow to minimum 90-percent maximum density. <br />7-09.3(9) Bedding the Pipe <br />Revise the first paragraph in 7-09.3(9) to read as follows: <br />Place sand backfill for pipe zone bedding to the depths shown in COE Standard <br />Drawing No. 615. Compact sand backfill for pipe zone bedding around the pipe to <br />90-percent of maximum density by approved hand-held tools, so as to provide firm <br />and uniform support for the full length of the pipe, valves, and fittings. Determine <br />maximum in place density using nuclear method (ASTM 2922-17). Determine <br />laboratory maximum dry density and optimum moisture content using the Modified <br />Proctor Method in accordance with ASTM D-1557. Take care to prevent damage to <br />the pipe and its protective coating. <br />7-09.3(10) Backfilling Trenches <br />Revise the last paragraph in 7-09.3(10) to read as follows: <br />Place a minimum 12-inch sand cushion between the water main and existing <br />pipelines or other conduits when encountered during construction. <br />Supplement 7-09.3(10) by adding the following: <br />Backfill trenches in accordance with COE Standard Drawings No. 614, 615 and 620.
The URL can be used to link to this page
Your browser does not support the video tag.