CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />3rd Ave Water Quality Facility Division B – BID DESCRIPTIONS September 20, 2024 <br />WO No. – UP 3775 SP - 18 <br /> <br /> Gravel Borrow Incl. Haul <br />Measurement and Payment: Unit Price per Ton (TON) <br />Measurement for Gravel Borrow shall be by the ton, recorded on certified weight tickets in <br />accordance with 1-09.2 WEIGHING EQUIPMENT, and placed within the limits of dimensions <br />defined in the Work, descriptions for other bid items, shown on the Plans, or COE Standard <br />Drawings, or as otherwise approved by the Engineer. <br />Gravel Borrow material placed exceeding “neatline” quantities without advance authorization <br />by the Inspector will not be paid for. <br /> <br />The unit price per ton, based on certified weight tickets, for gravel borrow shall be full <br />compensation for all labor, material, tools and equipment necessary to furnish imported <br />gravel borrow for trench backfill where Engineer has determined native soils are not suitable <br />for backfill, and other Work as required, from a Contractor-supplied source in accordance <br />with 2-03.3(14)J of the Standard Specifications and these Special Provisions. <br />The unit price for gravel borrow shall include all costs of furnishing, hauling, stockpiling, <br />placing, grading and compacting the material in place. <br />The unit price for this bid item includes all costs for removing, loading and disposing of <br />displaced unsuitable material, including haul. <br /> Trench Excavation Safety Systems, LS <br />Measurement and Payment: Lump Sum (LS) <br />The lump sum bid item includes the costs directly allocated to the safety system for trenches <br />and all other excavations including, but not limited to, shoring, benching, bracing, excavation, <br />sheeting, and trench box. This Work shall be accomplished in accordance with Divisions 1, <br />2, 7, and 8 of the Standard Specifications and these Special Provisions. Payment per lump <br />sum includes all equipment, materials, labor, installation, and removal, and all other work <br />required to meet the trench excavation and safety system requirements. <br /> Crushed Surfacing Base Course <br />Measurement and Payment: Unit Price per Ton (TON) <br />Measurement for crushed surfacing base course will be by the ton as recorded on certified <br />weight tickets in accordance with 1-09.2 WEIGHING EQUIPMENT and limited to dimensions <br />defined in the Work, descriptions for other bid items, shown on the Plans, details or COE <br />Standard Drawings or as otherwise approved by the Engineer. In addition to surfacing, this <br />product will be paid by the ton for sewer and storm pipe bedding and gravity block wall and <br />pretreatment unit foundation. Crushed Surfacing Base Course material placed exceeding <br />“neatline” quantities without advance authorization by the Inspector will not be paid for. <br />The unit price per ton shall be full compensation for all labor, compaction, material, tools, and <br />equipment necessary to furnish, haul, stockpile, place, grade, and compact imported crushed <br />surfacing base course for the Work as required, from a Contractor supplied source in <br />accordance with the Standard Specifications and these Special Provisions. <br />The unit price for crushed surfacing base course also includes all costs for controlling <br />moisture content. <br />Also included in this bid item shall be the cost of all equipment required to remove existing <br />soils to attain proper elevations, compaction of native subgrade soils, as well as to uniformly <br />spread and compact the crushed surfacing material. <br />The unit price for this bid item includes all costs for removing, loading and disposing of <br />displaced unsuitable material, including haul.