CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />3rd Ave Water Quality Facility Division B – BID DESCRIPTIONS September 20, 2024 <br />WO No. – UP 3775 SP - 21 <br /> <br />depth of 10-ft as measured from the flowline of the outlet pipe to the surface of the Work <br />measured to the nearest foot. <br />The unit price for each inlet and catch basin shall also include, but not be limited to, all costs <br />for excavation; hauling and disposing of surplus or unsuitable material; dewatering, storm <br />water flow bypassing, furnishing and installing couplings; furnishing and installing steps or <br />ladder; placing and compacting of suitable bedding below structures; furnishing, placing, and <br />compacting foundation material as required; cleaning and flushing catch basins; and <br />reconnecting existing storm drainage connections. <br />All costs associated with abandoning, and/or removing and disposing of existing catch basins <br />and inlets, salvaging frame and grate or cover, as shown on the plans shall be included in <br />the unit price for this bid item. <br />Adjusting new catch basin inlets to final grade is incidental and shall be included in the unit <br />price for this bid item. <br />The cost of connection of pipes, including existing pipes, to the inlet or catch basin is <br />incidental and shall be included in the unit price for this bid item. <br />Measurement and payment shall be per each catch basin inlet installed as measured upon <br />completion. <br /> <br /> Connect to Existing Drainage Structure <br />Measurement and Payment: Unit Price per Each (EA) <br />The unit price per each for the Connection to Existing Drainage Structure shall be full <br />compensation for all labor, materials, incidentals, tools, and equipment necessary to satisfactorily <br />complete the work as defined in these Contract Documents, including, but is not limited to, core <br />drilling into existing structure and repairing and grouting gaps around the new pipe connection a <br />new pipe connections to existing drainage structures as shown on the Plans. <br /> <br /> Pretreatment Unit <br />Measurement and Payment: Unit Price per Each (EA) <br />The unit price per each for the Pretreatment Unit shall be full compensation for all labor, materials, <br />incidentals, tools, and equipment necessary to satisfactorily complete the work as defined in these <br />Contract Documents, including, but is not limited to, dewatering; storm water flow bypassing, <br />fabrication, excavation, installation of the Pretreatment Unit and connection to existing pipes with <br />require pipe segments and couplings. <br /> Water Quality Treatment Facility <br />Measurement and Payment: Lump Sum (LS) <br />The lump sum price for Water Quality Treatment System shall be full compensation for all labor, <br />materials, incidentals, tools, and equipment necessary to satisfactorily complete the work as <br />defined in these Contract Documents. <br />The lump sum price includes, but is not limited to, excavation, installation, backfill and compaction <br />of the water quality treatment facility, connection to storm drains, and installation of internal <br />components. All component material and installation associated with the facility shall be included <br />in the lump sum price including, but not limited to, dewatering, storm water flow bypassing, <br />treatment soil mix, underdrain, underdrain stone, dissipation rocks, geotextile liner, bubbler <br />system, mulch and installation of plant materials with water during until project close-out. The <br />bubbler system including, but not limited to, distribution pipe, bubblers, risers, cleanouts, fittings