CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />3rd Ave Water Quality Facility Division B – BID DESCRIPTIONS September 20, 2024 <br />WO No. – UP 3775 SP - 22 <br /> <br />and tees. The lump sum price shall include all underdrain stone, or other soil material associated <br />with the water quality facility, including haul. <br />The lump sum price includes, but is not limited to, initial cleaning, commissioning, any <br />documentation, all components listed as provided by manufacture and all required maintenance <br />and guarantees described herein. <br /> Flow Splitter Modification <br />Measurement and Payment: Unit Price per Each (EA) <br />The unit price per each for the flow splitter modification shall be full compensation for all labor, <br />materials, incidentals, tools, and equipment necessary to satisfactorily complete the work as <br />defined in these Contract Documents. The unit cost includes, but is not limited to, excavation, <br />eccentric reducer, couplings, replacement of the catch basin lid, frame, and grate. <br /> Roof Drain Connection <br />Measurement and Payment: Unit Price per Each (EA) <br />The unit price per each for roof drain connections shall be full compensation for all labor, materials, <br />incidentals, tools, and equipment necessary to satisfactorily complete the work as defined in these <br />Contract Documents. <br />The unit price per each connection shall be full compensation for furnishing, hauling, and <br />assembling in place the completed installation, including underdrain, wyes, tees, caps, plugs, <br />special fittings, joint materials required to connect private roof drains to the stormwater system. <br /> Water Relocation Support <br />Measurement and Payment: Lump Sum (LS) <br />The lump sum price for Water Relocation Support shall be full compensation for all labor, <br />materials, incidentals, tools, and equipment necessary to satisfactorily complete the work as <br />defined in these Contract Documents in accordance with 7-09.3(26). <br />The lump sum price includes, but is not limited to, coordination with the City for water line <br />relocations, excavation, pipe and appurtenances removal, trenching, and bedding for new water <br />lines. The anticipated lengths of excavation are included in 7-09.3(26). The City will provide and <br />install the pipe, appurtenances, and new hydrant. The contractor will provide and install backfill <br />for the water relocations under Gravel Backfill Incl. Hall bid item. <br /> Erosion Control and Water Pollution Prevention <br />Measurement and Payment: Lump Sum (LS) <br />Erosion Control and Water Pollution Prevention shall constitute full compensation for all labor, <br />materials, tools and equipment necessary and incidental for the installation, maintenance <br />and removal of the temporary erosion and sedimentation control (TESC) facilities to prevent <br />pollution, erosion, siltation, and damage to any wetland, stream, other watercourse, or <br />surrounding property throughout the life of the Contract. TESC facilities shall include, but not <br />be limited to, any cover measures, runoff control measures, soil and site stabilization <br />measures as shown on the Plans, and inlet protection measures for the work area and <br />downstream areas. All required management, monitoring, documentation, and reporting of <br />TESC measures are included in the lump sum cost. <br />The TESC measures shall limit the erosion possibility by covering disturbed soils, preventing <br />sloughing or raveling of cut and natural slopes, and controlling surface runoff from flowing <br />into excavations using measures such as curbs, berms, dikes, rock-lined ditches, and other <br />approved measures. Filter fabric fence may be used to treat small areas of non-concentrated <br />runoff prior to discharge from the site.