My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Blue Mountain Construction Group, LLC 11/19/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Blue Mountain Construction Group, LLC 11/19/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 4:40:41 PM
Creation date
11/19/2024 11:14:18 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Blue Mountain Construction Group, LLC
Approval Date
11/19/2024
Council Approval Date
11/6/2024
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
3rd Ave Water Quality Facility
Tracking Number
0004585
Total Compensation
$610,415.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Blue Mountain Construction 9/30/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />3rd Ave Water Quality Facility Division B – BID DESCRIPTIONS September 20, 2024 <br />WO No. – UP 3775 SP - 23 <br /> <br /> <br /> Roadside Restoration <br />Measurement and Payment: Force Account (FA) <br /> <br />This Roadside Restoration bid item shall be accomplished in accordance with 1-09.6 FORCE <br />ACCOUNT; except as modified as below. <br />The Roadside Restoration bid item has been included for specific miscellaneous work items <br />listed below that are to be completed outside of the right-of-way on private parcels. The <br />amount indicated in the Proposal for this bid items is to provide a common bid amount. The <br />actual amount paid under this bid item may vary from no payment to the full amount of the <br />bid item. Work performed under this bid item will be initiated with a work directive issued by <br />the Inspector in the field. <br />In lieu of the preceding prescribed method of determining payment for Force Account work, <br />payment may be made at unit prices or lump sum prices agreed to by the Engineer and the <br />Contractor prior to beginning the Force Account work. <br />The following miscellaneous construction work will be paid for by Force Account as specified <br />in 1-09.6 FORCE ACCOUNT. For the purpose of providing a common Proposal for all <br />Bidders, and for that purpose only, the City has estimated an amount and included it in the <br />bid item for Force Account work to become part of the total Bid by the Contractor. <br />(a) Vegetation preservation, furnishing and placing topsoil, compost, and soil <br />amendments, furnishing and planting seeds, sod, and plants of identified items <br />within the City right-of-way. <br /> <br /> Private Improvements <br />Measurement and Payment: Force Account (FA) <br /> <br />This Private Improvements bid item shall be accomplished in accordance with 1-09.6 FORCE <br />ACCOUNT; except as modified as below. <br />The Private Improvements bid item has been included for specific miscellaneous work items <br />listed below that are to be completed outside of the right-of-way on private parcels. The <br />amount indicated in the Proposal for this bid items is to provide a common bid amount. The <br />actual amount paid under this bid item may vary from no payment to the full amount of the <br />bid item. Work performed under this bid item will be initiated with a work directive issued by <br />the Inspector in the field. <br />In lieu of the preceding prescribed method of determining payment for Force Account work, <br />payment may be made at unit prices or lump sum prices agreed to by the Engineer and the <br />Contractor prior to beginning the Force Account work. <br />The following miscellaneous construction work will be paid for by Force Account as specified <br />in 1-09.6 FORCE ACCOUNT. For the purpose of providing a common Proposal for all <br />Bidders, and for that purpose only, the City has estimated an amount and included it in the <br />bid item for Force Account work to become part of the total Bid by the Contractor. <br />(b) Vegetation preservation, removal, storage, and replacement of identified items <br />outside of the right-of-way. <br />(c) Furnishing and placing topsoil, compost, and soil amendments, furnishing and <br />planting seeds, sod, plants, and installing the dogwood tree noted on the Plans <br />that are outside of the right-of-way.
The URL can be used to link to this page
Your browser does not support the video tag.