Laserfiche WebLink
Page 21 of 59 <br /> <br />City of Everett Merrill & Ring Bridge Replacement <br />Deliverables: <br />x Preliminary NEPA CE Form and technical memos for; Cultural Resources; Bridge <br />Architectural History; Environmental Justice; and Hazmat Screening provided in Word or <br />PDF format provided at or near 60% PSE submittal date for WSDOT submittal by City. <br />x Review draft and final Critical Areas Technical Memo in PDF format provided at or near <br />60% PSE submittal for use in SEPA documentation and HPA. <br />x SEPA Checklist in PDF format provided at or near 60% PSE submittal. <br />x Final NEPA CE Form prepared for City of Everett signature and WSDOT submittal <br />provided by Perteet at or after 60% PS&E submittal. <br />4.3 Prepare JARPA Form for HPA and Facilitate WDFW HPA Submittal and Review: <br />Perteet will prepare a Joint Aquatic Resources Permit Application (JARPA) and will provide <br />electronic HPA submittal with the Critical Areas Memo and selected PSE drawings for HPA <br />permit review, assumed to occur post SEPA issuance and at or near the 90% PSE phase. <br />Assumptions: <br />x A SEPA Determination will be noticed/processed/obtained by the City prior to the HPA <br />JARPA submittal. <br />x HPA JARPA submittal with project drawings prepared under other tasks is assumed to be <br />necessary due to work over Merrill & Ring Creek for the bridge replacement and no in- <br />water work in the creek is assumed to occur. <br />x HPA will be the only purpose of the JARPA application for work above (over) a stream. <br />x A supplemental scope of work to this agreement may be needed if any additional <br />mitigation, design, or other documentation is required by WDFW (or other parties) other <br />than containment measures for bridge demolition/construction, buffer vegetation <br />restoration, or other readily available information provided under this scope of work. <br />x A site recon meeting with WDFW is assumed and no additional meetings are assumed for <br />HPA review. Periodic email check-ins with the Cityand WDFW will be provided by <br />email or virtual means by the CONSULTANT for approximately 4 weeks after the <br />JARPA submittal to facilitate HPA review, assuming no more than a few hours per week <br />of maximum City coordination assistance during this time. <br />Deliverables: <br />x Perteet correspondence via phone and/or email. <br />x Draft and final documents provided to the City by email to comprise the electronic HPA <br />submittal package to be submitted to WDFW by email. This will include the Critical <br />Area Memo (prepared under separate task item), SEPA determination (provided by City), <br />JARPA form (as described herein), and selected design drawings and available <br />information to illustrate and describe the project for HPA review.