Laserfiche WebLink
Page 22 of 59 <br /> <br />City of Everett Merrill & Ring Bridge Replacement <br />4.4 NPDES Construction Stormwater General Permit (CSGP) <br />It is unknown if construction of the PROJECT may require an acre or more of cumulative land <br />disturbance triggering CSGP Notice of Intent (NOI) submittal. However, submitting for permit <br />coverage is advised since work will occur over Merrill & Ring Creek and permit coverage could <br />be required by ecology due to potential water quality risks to the stream. If no permit is obtained <br />prior to construction, Ecology could require coverage during construction and cause construction <br />delays. <br />Assumptions: <br />x Perteet will prepare and submit a NOI electronically after issuance of SEPA exemption or <br />SEPA determination. <br />x The City will be provided with applicant forms after submittal and will need to sign and <br />return forms to Ecology and publish the required public notices. <br />x Permit coverage will be transferred to the Operator (Contractor) after bid award and <br />before construction. All permit fees will be paid by permittee and transfer of coverage <br />will be included in the project manual. <br />x The Stormwater Pollution Protection Plan (SWPPP) will be indicated to be provided by <br />Contractor in specifications and permit compliance will be addressed by Contractor. <br />Deliverables: <br />x Draft and final NOI submitted electronically by Perteet. <br />x Specification language for Contractor compliance and permittee responsibility. <br /> <br />