My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
David Evans and Associates, Inc. 11/18/2024
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
David Evans and Associates, Inc. 11/18/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2026 11:40:47 AM
Creation date
11/19/2024 2:15:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
David Evans and Associates, Inc.
Approval Date
11/18/2024
Council Approval Date
11/13/2024
End Date
12/31/2027
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Merrill and Ring Creek Bridge Replacement Project
Public Works WO Number
3829-001
Tracking Number
0004588
Total Compensation
$4,024,383.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
David Evans and Associates, Inc. 1/26/2026 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 37 of 59 <br /> <br />City of Everett Merrill & Ring Bridge Replacement <br />x Content and graphics for up to two (2) different sized display ads during Phase 2 <br />outreach. <br />x Content and graphics for up to one (1) large banner for the Phase 2 in-person public event <br />and to publicize the online engagement site. <br />x Content and graphics for up to ten (10) display boards for the Phase 2 in-person public <br />event. <br />x Content for up to three (3) email updates for the City to share with interested <br />stakeholders. <br />x Content and images for up to two (2) rounds of social media content for Phase 2 and <br />Phase 3 outreach. <br />Content and images for up to one (1) utility mailer to promote the in-person public event and <br />corresponding online open house. <br />10.7 Outreach summary <br />EnviroIssues will prepare an outreach summary report for each project phase (3 reports), <br />including what we heard from stakeholders and the community, outreach approach and methods, <br />and how feedback influenced the solutions. <br /> <br />10.8 Pre-Construction Communications Plan and Open House <br />EnviroIssues will update existing communications plan to include any known construction <br />schedule or impacts information available during the pre-construction phase. <br /> <br />EnviroIssues will provide two (2) staff to support the in-person “meet the contractor” open <br />house. EnviroIssues will develop an (1) open house plan, including notifications, materials, <br />staffing and other logistics. EnviroIssues will assist in the development of display boards as well <br />as otherancillary items such as sign-in sheets and comment forms. EnviroIssues will develop a <br />PowerPoint presentation for use at the event. The City will be responsible for the distribution of <br />notifications, including the postcard, posters, flyers, social media and other communications; <br />EnviroIssues will help in the development of content. <br />x Up to one (1) open house plan. Content and graphics for a “meet the contractor” open <br />house digital invitation.Content and graphics for up to two (2) new display boards; <br />assumes we will reuse project information materials from prior phases. <br />Assumptions: <br />x The scope of work does not include outreach for construction activities, or outreach to <br />detour route stakeholders. Scope and budget amendments would be required for those <br />work elements and future project phases. <br />x The City will coordinate necessary internal City review of all plans and materials, <br />consolidating edits and providing feedback to Consultant team. <br />x EnviroIssues will develop content for up to one (1) initial stakeholder email and phone <br />call script. The City and technical team will lead stakeholder interviews, briefings and <br />phone calls recommended for the project, including City leadership and staff/subject
The URL can be used to link to this page
Your browser does not support the video tag.