Laserfiche WebLink
1 I 2 I 3 I 4 I 5 I 6 I 7 I 8 I 9 I 10 <br /> 1.GENERAL REQUIREMENTS: B. CABLES AND CONDUCTORS <br /> A.DRAWINGS AND SPECIFICATIONS 1)POWER <br /> 1)ALL PLANS AND SPECIFICATIONS FROM THIS SET OF DOCUMENTS AND ALL OTHER DISCIPLINES RELATED TO THIS PROJECT ARE HEREBY INCORPORATED INTO AND BECOME A PART OF THIS DOCUMENT. a.ALL WIRING AND CABLE SHALL BE RATED FOR 600V UNLESS NOTED OTHERWISE AND MANUFACTURED BY GE,OKONITE,GENERAL CABLE,OR APPROVED EQUAL.MINIMUM CONDUCTOR SIZE SHALL BE <br /> CONTRACTOR SHALL ASSESS ALL RELATED PLANS AND SPECIFICATIONS FROM OTHER DISCIPLINES;THE SUBMISSION FOR BID FOR SAID PROJECT INDICATES THESE REQUIREMENTS HAVE BEEN #12 AWG.ALL WIRE SHALL BE STRANDED COPPER. <br /> A ACKNOWLEDGED. A <br /> b.MC CABLE MAY BE USED IN CONCEALED AREAS WHERE ACCESSIBLE AND APPROVED BY ENGINEER. <br /> 2)ELECTRICAL PLANS ARE DIAGRAMMATIC AND INDICATE GENERAL SCOPE OF WORK,LAYOUT OF ELECTRICAL EQUIPMENT INCLUDING,BUT NOT LIMITED TO,ELECTRICAL DISTRIBUTION EQUIPMENT, <br /> RACEWAYS,BOXES,RECEPTACLES,AND WIRING DEVICES.BECAUSE THESE PLANS ARE DIAGRAMMATIC,SOME ITEMS MAY NOT BE INCLUDED BUT SHALL BE PROVIDED BY THE CONTRACTOR IN ORDER TO c.SEPARATE NEUTRAL CONDUCTOR SHALL BE PROVIDED FOR ALL CIRCUITS;MULTI CIRCUIT USE ON A SINGLE NEUTRAL SHALL NOT BE PERMITTED. <br /> CONSTRUCT A COMPLETE AND FULLY FUNCTIONAL SYSTEM.WHEN QUESTIONS ARISE CONCERNING THE CONSTRUCTION OF THE PROJECT,CONTRACTOR SHALL PROVIDE AN RFI TO THE ENGINEER <br /> CLARIFYING SAID QUESTION PRIOR PROCEEDING ON THAT RELATED PART OF THE PROJECT. 2)ALL WIRING ABOVE CEILINGS TO BE PLENUM RATED. <br /> 3)WHERE REQUIREMENTS OF PLANS AND SPECIFICATIONS CONFLICT WITH EACH OTHER,THE MOST STRINGENT REQUIREMENT SHALL BE REQUIRED. 3)CONTROL WIRING AND CONDUIT FOR MECHANICAL EQUIPMENT INCLUDING BUT NOT LIMITED TO,THERMOSTATS,HUMIDISTATS,RELAYS,AND CONTROLLERS SHALL BE FURNISHED,INSTALLED AND WIRED <br /> BY THE MECHANICAL CONTRACTOR,UNLESS OTHERWISE NOTED. <br /> 4)THE WORD"PROVIDE"SHALL INDICATE THAT THE CONTRACTOR IS TO FURNISH AND INSTALL SAID ITEM. <br /> C.MOTORS — <br /> B. SCOPE OF WORK 1)FURNISH AND INSTALL ALL WIRING AND CONNECTIONS TO MOTORS SHOWN ON THE PLANS.FURNISH AND INSTALL DISCONNECT OR COMBINATION MOTOR STARTER/DISCONNECT SWITCHES FOR ALL <br /> MOTORS.PROVIDE HAND-OFF-AUTO CONTROL AND GREEN RUN LIGHT FOR ALL COMBINATION STARTERS. <br /> 1)PROVIDE ALL MATERIAL AND LABOR REQUIRED TO COMPLETE ELECTRICAL WORK INDICATED ON THE PLANS OR SPECIFIED WITHIN THESE SPECIFICATIONS REQUIRED TO COMPLETE THE CONSTRUCTION <br /> OF THE PROJECT AS INDICATED. D. EQUIPMENT PROVIDED BY OTHERS <br /> 2)MAJOR EQUIPMENT AND/OR SYSTEMS REQUIRED TO BE INSTALLED FOR THIS PROJECT INCLUDE,BUT SHALL NOT LIMITED TO,THE FOLLOWING: 1)THE CONTRACTOR SHALL ROUGH-IN AND CONNECT TO ALL EQUIPMENT PROVIDED BY OTHERS. DISCONNECT SWITCHES AND STARTERS ARE BY THE CONTRACTOR UNLESS OTHERWISE NOTED. <br /> COORDINATE WITH OTHER TRADES. <br /> a.FEEDER AND BRANCH CIRCUIT WIRING SYSTEMS <br /> B E. GROUNDING B <br /> b.RACEWAY AND BOX SYSTEMS <br /> 1)EQUIPMENT GROUNDING CONDUCTOR <br /> c.GROUNDING SYSTEMS <br /> a.IDENTICAL INSULATION TO PHASE CONDUCTORS. PROVIDE AN EQUIPMENT GROUNDING CONDUCTOR WITH ALL FEEDERS AND BRANCH CIRCUITS.SIZED AS REQUIRED BY TABLE 250.122 OF THE NEC, <br /> d.ELECTRICAL DISTRIBUTION SYSTEM EXCEPT WHERE A LARGER SIZE CONDUCTOR IS SHOWN ON THE CONTRACT DRAWINGS. <br /> 3)ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK OF THEIR RESPECTIVE SUB-CONTRACTORS AND MATERIALS.CONTRACTOR SHALL INCLUDE ALL LABOR AND MATERIALS REQUIRED FOR F. EQUIPMENT IDENTIFICATION <br /> A COMPLETE AND FULLY FUNCTIONAL SYSTEM. <br /> 1)PROVIDE ENGRAVED PHENOLIC EQUIPMENT NAME PLATES FOR ALL ELECTRICAL DISTRIBUTION EQUIPMENT INCLUDING,BUT NOT LIMITED TO,SWITCHGEAR,PANELBOARDS,MOTOR CONTROL CENTERS, <br /> 4)ALL ELECTRICAL EQUIPMENT TO BE DEMOLISHED OR SALVAGED TO OWNER SHALL HAVE ITS ASSOCIATED RACEWAYS AND CONDUCTORS REMOVED BACK TO ITS SOURCE. MOTOR STARTERS AND DISCONNECTS.NAMEPLATES SHALL DISPLAY EQUIPMENT NAME AND LOCATION/EQUIPMENT IT IS BEING SERVED FROM. — <br /> 5)ALL EQUIPMENT TO REMAIN SHALL BE PROTECTED,UNDISTURBED,AND SHALL REMAIN COMPLETE AND FULLY FUNCTIONAL. 2)ALL CIRCUITS WITHIN A PANELBOARD,SWITCHBOARD,PULLBOX,ETC SHALL BE PROVIDED WITH A CONDUCTOR TAG TO IDENTIFY THE CONDUCTORS USED.WIRE TAGS SHALL BE NON-CONDUCTIVE AND <br /> WEATHER RESISTANT. <br /> 6)THE ABSENCE OF ANY REQUIRED PARTS FROM PLANS OR SPECS THAT ARE IMPLIED DUE TO THE NATURE OF THE SYSTEM/WORK SHALL NOT RELEASE CONTRACTOR FROM PROVIDING SUCH WORK.THE <br /> ELECTRICAL SYSTEM SHALL BE PROVIDED TO BE COMPLETE AND FULLY FUNCTIONAL. 3)ALL NON-CONCEALED RACEWAYS SHALL BE PROVIDED WITH STAINLESS STEEL ENGRAVED TAGS UTILIZING UV RESISTANT CABLES TIES AS REQUIRED.THE TAG SHALL DISPLAY THE MATCHING CONDUIT <br /> TAG WHEN PROVIDED BY THE PLANS;IF NO CONDUIT TAG IS PROVIDED ON PLANS,THE TAG SHALL STATE THE EQUIPMENT THE CONDUIT IS ROUTING TO AND FROM. <br /> 7)EQUIPMENT TO BE DEMOLISHED SHALL BE REMOVED AND DISPOSED OF PER LOCAL REGULATIONS.OWNER SHALL HAVE FIRST RIGHT TO SALVAGE ANY AND ALL EQUIPMENT TO BE DEMOLISHED. <br /> 4)PANELBOARDS SHALL BE PROVIDED WITH A TYPED AND PRINTED PANEL DIRECTORY;HANDWRITTEN DIRECTORIES SHALL NOT BE ACCEPTABLE. <br /> C C.CODES,PERMITS,AND INSPECTIONS 3.EXECUTION: C <br /> 1)ALL WORK SHALL ADHERE TO THE LATEST ADOPTED VERSION OF CODES,INCLUDING BUT NOT LIMITED TO ALL LOCAL,CITY,COUNTY,STATE,NATIONAL,PUBLIC UTILITIES,AND ALL OTHER AHJs.THIS A.MOTORS SHALL BE TESTED FOR PROPER ROTATION AND BALANCED LOADS ON EACH PANELBOARD PHASE.FAILED EQUIPMENT SHALL BE REPLACED AS REQUIRED. <br /> SHALL INCLUDE ALL REQUIREMENTS OF THE NATIONAL ELECTRICAL CODE,AS INTERPRETED BY THE LOCAL INSPECTION DIVISION. B. RACEWAYS,EXCEPT AS OTHERWISE SPECIFICALLY NOTED,SHALL BE CONCEALED.EXPOSED RACEWAYS SHALL BE RUN PARALLEL WITH SUPPORTING WALL,BEAM,OR CEILING AND WITH EACH OTHER.ALL <br /> RACEWAYS SHALL BE INSTALLED IN SUCH A MANNER AS TO AVOID TRAPPED CONDENSATION.ALL CONDUIT EXPOSED IN FINISHED SPACES SHALL BE PAINTED TO MATCH ADJACENT SURFACES. <br /> 2)ALL CODES,RULES,AND REGULATIONS ARE HEREBY INCORPORATED INTO THIS SET OF PLANS AND SPECIFICATIONS HEREIN.ANY WORK PERFORMED BY CONTRACTOR THAT DOES NOT COMPLY WITH <br /> SAID CODES,RULES,AND REGULATIONS SHALL BE REVISED TO COMPLY AS REQUIRED;ALL CHANGES SHALL BE MADE AT THE CONTRACTOR'S EXPENSE. C.RACEWAYS SHALL BE SUPPORTED TO THE BUILDING/STRUCTURE WITH UL LISTED,OR EQUAL,SPACED AS REQUIRED BY NEC. <br /> 3)ALL EQUIPMENT SHALL BE LISTED AND LABELED,UL OR EQUAL,AND SHALL BE INSTALLED ACCORDING TO ITS LISTING AND LABELING. D.ALL SPARE RACEWAYS SHALL BE PROVIDED WITH NYLON PULL STRING. <br /> 4)CONTRACTOR SHALL PROVIDE ALL PERMITS AND CERTIFICATES OF INSPECTIONS.ALL PERMITS AND CERTIFICATES SHALL BE PROVIDED TO THE OWNER,PRIOR TO FINAL CONTRACT PAYMENT. E. BOXES SHALL BE INSTALLED IN ALL CONDUIT RUNS WHEREVER REQUIRED TO KEEP THE MAXIMUM NUMBER OF BENDS TO 270 DEGREES OR LESS IN ORDER TO FACILITATE THE PULLING OR WIRES OR CABLES. _ <br /> CONTRACTOR SHALL PAY ALL EXPENSES REQUIRED FOR ANY AND ALL PERMITS,CERTIFICATES AND INSPECTIONS. ALL JUNCTION AND PULLBOXES SHALL BE GALVANIZED OR DIE-CAST ALUMINUM.BOXES SHALL BE PROVIDED WITH REMOVABLE COVERS,SECURED WITH MACHINE SCREWS.BOXES SHALL BE NEMA RATED FOR <br /> THE ENVIRONMENT THAT THEY ARE INSTALLED IN. <br /> D. CONSTRUCTION COORDINATION <br /> F. LOCATIONS OF ELECTRICAL DEVICES AND EQUIPMENT INDICATED ON PLANS ARE APPROXIMATE UNLESS OTHERWISE NOTED.CONTRACTOR SHALL RESOLVE CONFLICTS WITH OTHER EQUIPMENT, <br /> 1)CONTRACTOR SHALL ENSURE ALL EQUIPMENT WILL FIT IN PROPOSED SPACES PRIOR TO ORDERING AND INSTALLATION.ANY EQUIPMENT ORDERED AND OR INSTALLED THAT DOES NOT FIT IN ALLOCATED ARCHITECTURAL FEATURES,AND STRUCTURAL MEMBERS AS REQUIRED. <br /> SPACE OR CAUSES INTERFERENCES THAT CANNOT BE OVERCOME/COORDINATED WITH OTHER DISCIPLINES,SHALL BE RETURNED AND OR UNINSTALLED AT THE CONTRACTORS EXPENSE. <br /> G.DO NOT DISTURB ANY STRUCTURAL MEMBER OR BUILDING SURFACE WITHOUT SPECIFIC APPROVAL OF THE STRUCTURAL ENGINEER OR ARCHITECT.PROVIDE CUTTING,CHANNELING,CHASING,OR DRILLING OF <br /> 2)WHEN CONSTRUCTION COORDINATION ISSUES PRESENT THEMSELVES,CONTRACTOR SHALL INFORM ENGINEER AS SOON AS POSSIBLE WITH A CLEAR AND CONCISE RFI. FLOORS,WALLS,PARTITIONS,CEILINGS,PAVING,OR OTHER SURFACES REQUIRED FOR THE INSTALLATION,SUPPORT,OR ANCHORAGE OF CONDUIT,RACEWAYS,OR OTHER ELECTRICAL MATERIALS AND <br /> EQUIPMENT AS REQUIRED FOR THE CONSTRUCTION OF THE PROJECT. <br /> E. MATERIALS AND WORKMANSHIP <br /> D H.ALL DISTURBED SURFACES SHALL BE RESTORED TO NEW OR EXISTING CONDITIONS AS REQUIRED.PENETRATIONS TO FIRE RATED MATERIALS SHALL BE RESTORED TO EQUAL RATING AS REQUIRED BY THE D <br /> 1)GENERAL AHJ. <br /> a.WORK SHALL BE PERFORMED IN A CLEAN,PROFESSIONAL,WORKMANLIKE MANNER BY A LICENSED ELECTRICIAN;WORK SHALL BE PERFORMED TO MEET NECA 1 REQUIREMENTS. I. CONNECT ALL ELECTRICAL EQUIPMENT TO GROUNDING SYSTEM AS DIRECTED.ALL ELECTRICAL EQUIPMENT,RACEWAYS,BOXES,GROUNDING ELECTRODE SYSTEMS,BUS BARS,BUSHINGS AND CONDUCTORS <br /> SHALL BE PROPERLY GROUNDED PER NEC.ALL RACEWAYS SHALL BE PROVIDED WITH A GROUND WIRE. <br /> b.ALL MATERIALS AND EQUIPMENT SHALL BE NEW AND FAULT FREE UNLESS NOTED OTHERWISE. <br /> J. ALL WORK SHALL BE CLEAR OF ALL DEBRIS AND TRASH PRIOR TO THE END OF WORK EACH DAY. UPON COMPLETION OF WORK,ALL DEBRIS AND TRASH SHALL BE REMOVED FROM JOB SITE AT THE <br /> F. SUBMITTALS CONTRACTOR'S EXPENSE,PROVIDING THE FACILITY IN A CLEAN AND FULLY FUNCTIONAL MANNER. <br /> 1)ANY AND ALL PROPOSED EQUIPMENT TO BE UTILIZED TO CONSTRUCT SAID PROJECT SHALL BE SUBMITTED TO ENGINEER FOR REVIEW PRIOR TO ORDERING AND INSTALLATION.ALL SUBMITTALS SHALL 4.PROJECT CLOSEOUT: <br /> CONSIST OF ANNOTATED CUTSHEETS,SHOP DRAWINGS,SCHEMATICS,AND/OR WIRING DIAGRAMS;SAID DOCUMENTS SHALL BE HIGHLIGHTED TO INDICATE PRODUCT DETAILS,PART NUMBER,LISTING AND — <br /> LABELING. A.AT THE COMPLETION OF THE PROJECT,THE CONTRACTOR SHALL PROVIDE THE FOLLOWING: <br /> 2)SUBMITTALS SHALL BE ELECTRONIC IN PDF FORMAT.SUBMITTALS SHALL NOT BE SCANNED,ALL DOCUMENTS SHALL BE FROM AN ORIGINAL ELECTRONIC FILE.THE PDF SUBMITTAL SHALL BE FORMATTED 1)SUBMIT OPERATION AND MAINTENANCE MANUALS FOR EACH PIECE OF EQUIPMENT SUBMITTED ON DURING SUBMITTAL PROCESS.ALL SECTIONS SHALL BE DIVIDED WITHIN THE PDF SEPARATING SPECIFIC <br /> TO HAVE EACH PRODUCT SEPARATELY BOOKMARKED WITH DESCRIPTION OF THE EQUIPMENT AS THE BOOKMARK TITLE,FRONT COVER PAGE SHALL INCLUDE THE FOLLOWING:PROJECT NAME,DATE, EQUIPMENT AS REQUIRED. <br /> CONTRACTOR NAME AND CONTACT INFORMATION. <br /> 2)SUBMIT A LIST OF RECOMMENDED SPARE PARTS. <br /> 3)CONTRACTOR SHALL SUBMIT CUTSHEETS INCLUDING SHOP DRAWINGS AND PRODUCT DATA.PROPOSED EQUIPMENT CUTSHEETS SHALL INDICATE PART NUMBERS INCLUDING ALL OPTIONS.THE <br /> FOLLOWING EQUIPMENT TO BE SUBMITTED ON INCLUDES,BUT IS NOT LIMITED TO,THE FOLLOWING: 3)SUBMIT MARKED UP'AS-BUILT'DRAWINGS WITH FINAL INSTALLED ARRANGEMENTS,INCLUDED EQUIPMENT MODEL NUMBERS AND PERFORMANCE DATA.'AS-BUILT'DRAWINGS SHALL BE PROVIDED TO THE <br /> OWNER ON A NEW DRAWING SET,WITH FIELD CHANGES TRANSCRIBED FROM THE WORKING SET IN A NEAT AND PROFESSIONAL MANNER.IF RECORD DRAWINGS ARE DEEMED INCORRECT OR INCOMPLETE <br /> E a.RACEWAYS AND BOXES. BY ENGINEER REVIEW,CONTRACTOR SHALL REVISE DRAWINGS AS REQUIRED TO COMPLETELY DOCUMENT THE AS-BUILT CONDITIONS. E <br /> b.CONDUCTORS. 4)GUARANTEE:FULLY GUARANTEE MATERIALS AND WORK UNDER THIS SECTION,FOR PERIOD OF ONE YEAR FROM THE DATE OF FINAL ACCEPTANCE BY THE OWNER,AGAINST IMPERFECT WORKMANSHIP, <br /> FAILURE,MALFUNCTION OF MATERIALS,OR EQUIPMENT DUE TO FAULTY OR IMPERFECT WORKMANSHIP.WORK FOUND TO BE DEFECTIVE WITHIN THIS PERIOD SHALL BE REPLACED WITHOUT COST TO THE <br /> c.GROUNDING EQUIPMENT. OWNER.THE FULL COST OF MAINTENANCE,LABOR AND MATERIALS REQUIRED TO CORRECT ANY DEFECT DURING THIS ONE-YEAR PERIOD SHALL BE INCLUDED IN THE SUBMITTAL BID. <br /> d.ELECTRICAL DISTRIBUTION EQUIPMENT(SWITCHBOARDS,PANELBOARDS,ETC). 5)PROVIDE ALL COMMISSIONING REQUIRED BY THE AHJ AND AS THIS DOCUMENT EXPRESSES HEREIN. <br /> e.DISCONNECT SWITCHES/ENCLOSED CIRCUIT BREAKERS. <br /> 4)SUBMITTALS NOT CORRECTLY FORMATTED OR NOT COMPLYING WITH THE ABOVE REQUIREMENTS SHALL BE REJECTED WITHOUT FURTHER REVIEW. <br /> 2.PRODUCTS AND MATERIALS: <br /> A.RACEWAYS <br /> 1)GALVANIZED RIGID STEEL(GRS)CONDUIT SHALL BE USED IN ALL LOCATIONS WHERE EXPOSED TO PHYSICAL DAMAGE,OR WHERE EXPOSED WITHIN 8'OF FINISHED FLOOR OR GRADE,AND FOR <br /> PANELBOARD FEEDERS.MINIMUM CONDUIT SIZE FOR ABOVE GROUND APPLICATIONS SHALL BE 3/4". MINIMUM CONDUIT SIZE FOR BELOW GROUND APPLICATIONS SHALL BE 1". <br /> 2)ELECTRICAL METALLIC TUBING(EMT)CONDUIT SHALL BE USED WHEN CONCEALED. <br /> F F <br /> 3)COMPRESSION FITTINGS SHALL BE UTILIZED;SET-SCREW FITTINGS ARE NOT ACCEPTABLE. <br /> 4)LIQUIDTIGHT FLEXIBLE STEEL CONDUIT SHALL BE USED ONLY TO SERVE MOTORS,TRANSFORMERS,AND OTHER VIBRATING EQUIPMENT.WHERE RIGID CONDUIT IS IMPRACTICAL,ENGINEER SHALL BE <br /> CONTACTED FOR APPROPRIATE RACEWAY SUBSTITUTION. <br /> 5)SCHEDULE 40 PVC SHALL BE USED FOR ALL UNDERGROUND APPLICATIONS UNLESS OTHERWISE NOTED.ALL SWEEPS EXTENDING ABOVE GRADE SHALL BE GRS WRAPPED WITH UL LISTED CORROSION <br /> RESISTANT TAPE.MINIMUM UNDERGROUND BURIAL DEPTH IS 24 INCHES. <br /> Drawing Title Phase Project Title Project Number <br /> STAMP CONSULTANT/DISCIPLINE ARCHITECT/ENGINEER OF RECORD ELECTRICAL SPECIFICATIONS CONSTRUCTION SET CNC AT SKILLS CENTER 1402300166 <br /> DISCIPLINE: A/E: <br /> R.ur2 ELECTRICAL ENGINEERING Building Number <br /> V pF WASH/a,O SPEES DESIGN BUILD RAH AEC _ <br /> PE QT0 23830 PACIFIC HIGHWAYS.SUITE 203 210 Shadow Lane NE <br /> Location Drawing Number <br /> Em <br /> 9001 AIRPORT RD EVERETT,WA 98204-1423 <br /> KENT,WA 98032 Olympia,WA 98506 ��� Mukilteo School Districts81 � y Issue Date Checked Drawn E-003 <br /> CONSTRUCTION SET 09/0612024 FSSONALENG SPEESDESIGNBULD ; p-o 09i00i202a SGGANNM JFO/JGD <br /> Revisions: Date: RESPONSIVE ACCOUNTABLE HUMBLE 040E 07 <br /> 1 I 2 I 3 I 4 I 5 I 6 I 7 I 8 9 1 10 <br />