|
LOAD CALCULATIONS GENERAL NOTES PtENGINEERSTYPE MARK EXISTING LOAD(VA) NEW LOAD(VA)
<br /> Pump#1 CWP-401 11426.25 VA 6600 VA 1. NOT ALL CONDUIT AND CONDUCTORS FOR BRANCH CIRCUITS HAVE BEEN SHOWN. ITS THE RESPONSIBILITY Seattle//Spokane//Baltimore
<br /> Pump#2 CWP-402 11426.25 VA 6600 VA OF THE CONTRACTOR SHALL INSTALL ALL REQUIRED CONDUIT AND WIRE FOR A COMPLETE INSTALLATION. Copyright©EST consulting engineers
<br /> Boiler Management System BMS 480 VA 480 VA 2. PROVIDE A DEDICATED NEUTRAL FOR ALL CONTROL WIRING.
<br /> Boiler#1 B-401 480 VA 1800 VA
<br /> Boller#2 B-402 480 VA 1800 VA 3. ALL WIRING SHALL BE CONCEALED IN CONDUIT. ALL CONDUIT SHALL BE CONCEALED IN FINISHED AREAS. • Electrical Consultants,Inc.
<br /> 19015 36th Avenue West,Suite E
<br /> TOTAL 24292.5 VA 17280 VA 4. HVAC CONTROLS-PROVIDE ALL CONDUIT FOR HVAC CONTROLS,AND ALL 120V CONTROL WIRING AS • Lynnwood,Washington 98036
<br /> REQUIRED BY THE MECHANICAL CONTROLS CONTRACTOR. COORDINATE REQUIREMENTS WITH Phone(425)775-1799 FAX(425)774-9870
<br /> MECHANICAL CONTRACTOR PRIOR TO BID.
<br /> NET DECREASE 7012.5 VA
<br /> 5. COORDINATE EQUIPMENT EQUIPMENT CONNECTION TYPES AND EXACT LOCATION PRIOR TO ROUGH-IN.
<br /> 6. PROVIDE ALL CODE REQUIRED DISCONNECTING MEANS,AND CONNECTIONS TO EQUIPMENT.
<br /> 7. CONDUIT ROUTING: CONDUIT ROUTING IS SHOWN AS A SUGGESTED METHOD. CONTRACTOR IS RESPONSIBLE
<br /> TO ROUTE CONDUIT TO MINIMIZE CONFLICT WITH OTHER EQUIPMENT AND PENETRATIONS. PATCH
<br /> AND REPAIR ALL PENETRATIONS TO ORIGINAL CONDITION. SEE SPECIFICATIONS.
<br /> DEMOLITION NOTES:
<br /> 1. REMOVE ALL EXISTING ELECTRICAL EQUIPMENT,CONDUIT,AND WIRE BACK TO SOURCE,OR NEAREST UPSTREAM 7
<br /> DEVICE NOT BEING REMOVED-ON SURFACES(WALLS,CEILINGS,FLOORS)BEING REMOVED AS PART OF THE L
<br /> CONTRACT. REFER TO MECHANICAL AND ARCHITECTURAL DEMOLITION PLANS FOR EQUIPMENT REMOVED. LLI
<br /> 2. REMOVE BACK TO SOURCE,EXISTING LOW VOLTAGE CABLING,CABLE TRAY,RACEWAY,MOUNTING EQUIPMENT, 2
<br /> ETC.,WHICH IS ASSOCIATED WITH TEL/COMM,TV,CALL SYSTEMS,AND FIRE ALARM DEVICES BEING REMOVED. W
<br /> 3. LEGALLY DISPOSE OF AND/OR RECYCLE MATERIAL BEING REMOVED AS REQUIRED BY STATE AND LOCAL r 1
<br /> JURISDICTIONAL AUTHORITIES.
<br /> 4. MAINTAIN,REPAIR,OR REPLACE EXISTING SYSTEMS NOT BEING INTERRUPTED,BUT ARE AFFECTED BY J
<br /> DEMOLITION WORK. ^
<br /> 5. COORDINATE ANY TEMPORARY INTERRUPTIONS IN POWER WITH OWNER AND ARCHITECT. SUBMIT SCHEDULE TO W
<br /> OWNER FOR APPROVAL,MINIMUM ONE WEEK PRIOR TO PROPOSED POWER INTERRUPTION.
<br /> 6. FOR THE REPLACEMENT OF ANY EXISTING DEVICES WITH NEW-THE CONTRACTOR SHALL MODIFY,PATCH,AND O
<br /> REPAIR THE EXISTING SURFACE TO ACCOMMODATE NEW DEVICE OR LIGHTING FIXTURE. PROVIDE NEW
<br /> MOUNTING EQUIPMENT AND SUPPORT,AS REQUIRED. EXTEND CONDUIT AND WIRE TO NEW DEVICE AS REQUIRED. I_ LL1
<br /> 1 1
<br /> 7. PATCH,REPAIR,AND PAINT EXISTING SURFACES THAT ARE AFFECTED BY REMOVAL OF EQUIPMENT,TO J J z
<br /> ORIGINAL CONDITION. FIRE SEAL PENETRATIONS THROUGH FIRE RATED ASSEMBLIES. COORDINATE PAINT O _
<br /> COLOR WITH OWNER. REPAIR IS SUBJECT TO APPROVAL BY OWNER AND ARCHITECT. O
<br /> O CO Q
<br /> V J it �>
<br /> SYMBOL LEGEND (� (D I j
<br /> POWER CO0 w
<br /> TO EXISTING PRIMARY JUNCTION
<br /> VAULT AT BUILDING 3/4 UTILITY YARD
<br /> � DUPLEX RECEPTACLE,GFCI TYPE,WITH WEATHERPROOF COVER. W/'� J
<br /> UNDERGROUND PRIMARY CIRCUIT 1-4" ® EQUIPMENT CONNECTION(INCLUDES CONDUCTORS, a_ Q
<br /> CONDUIT TRENCHING, AND BACKFILL TERMINATIONS,GROUNDING CONDUCTOR,ETC.) N
<br /> BY CONTRACTOR TO UTILITY REQUIREMENTS. LL
<br /> CONDUCTORS BY UTILITY. Ep DISCONNECT SWITCH OR COMBINATION MOTOR STARTER/ O
<br /> DISCONNECT SWITCH.SEE EQUIPMENT SCHEDULES.SWITCH UJ J
<br /> SHALL INCLUDE ALL REQUIRED CONNECTIONS. (60)INDICATES z
<br /> C _�4BQY/277V,3 PHASE,4 WIRE, SWITCH AMPERAGE/(40)INDICATES FUSE AMPERAGE. O
<br /> PADMOUNT TRANSFORMER BY UTILITY. Q
<br /> PAD AND VAULT BY CONTRACTOR G 208/120V PANELBOARD. LLI O
<br /> 23135 To UTILITY REQUIREMENTS. \
<br /> $ MANUAL MOTOR STARTER.SEE EQUIPMENT SCHEDULES. /
<br /> W U w_
<br /> SERVICE POINT BUILDING 3 AND 4 UNDERGROUND SECONDARY CIRCUIT
<br /> 4 SETS EACH WITH,3#350k—I+
<br /> 1#350k—il N+1#4G,3"C. 00
<br /> r n
<br /> V
<br /> VM CUSTOMER METERING AND PULSE INITIATING SHEET INDEX
<br /> C.T.'S FOR EMS. COORDINATE
<br /> AM 1� REQUIREMENTS WITH EMS VENDOR. E0.0 COVERSHEET
<br /> EO.1 PANEL SCHEDULES
<br /> 1 t9481 E1.0 ELECTRICAL PLAN
<br /> 3P-800A
<br /> U
<br /> 1 3-800AF 1
<br /> PANEL"DP4" (277/48OV,3J,4W)
<br /> 3P-100A 3P-600A 3P-100A 3P-200A 3P-100A 3P-100A 3P-100A 3P-100A 3P-100A 3P-100A 3P-200A 3P-60A 3P-60A a 1
<br /> p
<br /> -- 3-100AF --—-- 3-600AF -—3-100AF-- 3-200AF 3-50AP 3-70AF-—-- - 3=70AF -—- 3-SOAP - 3-70AF - 3-70AF - 3-125AF - 3-50AP 3-40AF
<br /> SPARE SPARE SPACE
<br /> _ 3#1+1#1N+ 2 SETS EACH WITH 3#6+1#1 OG, 3#4+1#8G, 3#4+1#8G, 3#6+1#1 OG, 3#4+1#8G, 3#4+1#8G, 3#1/0+1#6G, 3#6+1#10G, 3#4+1#8G,
<br /> 1#BG,1 1/4"C 3#350k—il+ 3/4"C 1"C 1"C 3/4"C 1"C 1"C 1 1/4"C 3/4"C 1"C
<br /> 1#350k-11 N+
<br /> 1#1G,3"C 3643 11204 7318 2994 10326 4926 13592 3367 1663
<br /> p 48OV p 460V S, 48OV p 480V p 480V p 480V Z, 480V p 480V A 480V EXISTING
<br /> "TP41" 30k VA I"TP42" 45kVA I "TP43" 45kVA 1 "TP44" 30kVA I I•'TP45" 45kVA I I"TC41"" 45kVA I"TC42" 75kVA I I"TDB" 30kVA "TKILN" 25kVA
<br /> (TRANSFORMER (TRANSFORMER (TRANSFORMER 1 (TRANSFORMER 1 (TRANSFORMER 1 (TRANSFORMER 1 (TRANSFORMER 1 (TRANSFORMER (TRANSFORMER A.
<br /> 120v 120v 120V 120V 120V 120V 120V 120v n 120V
<br /> X_208Y x 208Y x_208Y x_208Y Y'_208Y Y'_208Y Y' 208Y Y'_208Y _240V "v � �1
<br /> 20 0 3#2/0+1#2/ON+ 3#2/0+1#2/ON+ 341+1#1 N+ 3#2/0+1#2/ON+ 35 0 3#35Okcmil+ 3#1
<br /> 3#1+1#1N+ 1#4G,2"C 1#4G,2"C 1#6G,1 1/2"C 1#4G,2"C 3#2/0+1#2/ON+ 1#350kcmil N+ 1#1 2#1+1#1N+
<br /> 1#6G,1 1/2"C 3P-175A 3P-175A 3P-100A 3P-175A 1#4G,2"C 1#2G,3C _ - 1#6G,1 1/2"C 1#6G,1 1/4"C
<br /> (NOTE 5) (NOTE 5) (NOTE 5) (NOTE 5) - 3P-300A 3P-100A
<br /> 13145 18491
<br /> 3#2/0+1#2/ON+ __ 3#1+1#lN+ __ 3#2/0+1#2/ON+ __ (NOTE 5) (NOTE 5)
<br /> 00 �1#4G,2"C �1#6G,1 1/2"C �1#4G,2•'C F5A _- FlOA M
<br /> NOTE 4
<br /> I I I I I I I I I I I I I I I I I I I I I I I I I I
<br /> n l 3P-70A NOTE 4
<br /> Project No.
<br /> SECTION 1 SECTION 2 SECTION 3 SECTION 1 SECTION 2 SECTION 1 SECTION 2 23025
<br /> NOTE 4 NOTE 4 NOTE 4 NOTE 4 NOTE 4 NOTE 4 NOTE 4 NOTE 4 EXISTING
<br /> PANEL "L4"" PANEL "M4" PANEL "P41"" PANEL "P42" PANEL "P43" PANEL "P44"" PANEL "P45' PANEL "C41" PANEL "C42" DIMMER BANK PANEL "KI1LN" Date
<br /> (NOTE 1) (NOTES 1&2) (NOTE 1) (NOTES 1&2) (NOTE 1) (NOTE 1) (NOTE 1) (NOTE 1) (NOTES 1&2) (NOTE 1) (NOTE )
<br /> 3#4+1#8G, 09.11.2023
<br /> 1'"c
<br /> Date Revision
<br /> 15733
<br /> p 480V
<br /> I"TMP4" 45kVA
<br /> 120v1 TRANSFORMER
<br /> 2067 X-208Y
<br /> 3#2/0+1#2/ON+ Sheet itle.
<br /> 1#4G,2"C
<br /> ELECTRICAL COVER SHEET,
<br /> FSA__T BUILDING 4: ONE-LINE DIAGRAM NOTE: ONE-LINE DIAGRAM
<br /> I I I
<br /> NOT To SCALE EXISTING, FOR REFERENCE.
<br /> ALL EQUIPMENT SHOWN IS
<br /> L-- --J Sheet
<br /> SECTION 1 SECTION 2
<br /> (NOTES M&2) PERMIT SET EO .0
<br />
|