My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8717 7TH AVE SE 2024-12-31
>
Address Records
>
7TH AVE SE
>
8717
>
8717 7TH AVE SE 2024-12-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 1:17:49 PM
Creation date
12/17/2024 10:40:30 AM
Metadata
Fields
Template:
Address Document
Street Name
7TH AVE SE
Street Number
8717
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Commissioning Plan Page 10 <br /> 4. The commissioning team shall schedule activities to expedite the testing process <br /> and minimize unnecessary delays, while not compromising the integrity of the <br /> procedures. Successful commissioning requires cooperation of the General <br /> Contractor, Contractors, vendors, Architect, Engineers, Commissioning Authority, <br /> Owner, and building manager. <br /> IV. CX SCHEDULE <br /> A. Commissioning Milestone Schedule <br /> 1. The commissioning schedule summarizes the commissioning activities to be <br /> performed on the project. See attached Cx Schedule for details. <br /> B. Cx Schedule Coordination <br /> 1. General Contractor will provide the CA with a complete construction schedule. <br /> Upon receipt of construction schedule, the CA will provide the General <br /> Contractor and Owner with a complete commissioning schedule. <br /> 2. CA will coordinate with the General Contractor and subcontractors to integrate <br /> Cx activities into the overall construction schedule. The Cx schedule will be <br /> updated and submitted as information changes during the project. <br /> 3. Detailed integration of Cx activities and tasks into the construction schedule is <br /> critical to maintaining project milestones. Cx activities will be scheduled with the <br /> General Contractor prior to respective construction phase activities. <br /> 4. Cx activities will be coordinated to occur while required subcontractors' <br /> Verification and Testing personnel are on-site and available, per General <br /> Contractor's construction schedule. <br /> 5. Coordinated schedule will include milestone activities for each significant project <br /> event through construction to building systems commissioning completion. <br /> St. Mary Magdalen ES <br /> Neudorfer Engineers, LLC. Everett, WA <br />
The URL can be used to link to this page
Your browser does not support the video tag.