My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthwork Solutions, LLC 1/15/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthwork Solutions, LLC 1/15/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2025 1:51:12 PM
Creation date
1/15/2025 1:36:28 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthwork Solutions, LLC
Approval Date
1/15/2025
Council Approval Date
9/11/2024
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
FULTON STREET PEDESTRIAN BICYCLE CORRIDOR
Tracking Number
0004652
Total Compensation
$663,840.07
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
499
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Fulton Street Pedestrian Bicycle Corridor PAGE 6 OF 114 CONTRACT <br />FEDERAL AID # TAP-0420(026) <br />WO #3785 September 6, 2024 <br /> <br />Directions for delivery of the Disadvantaged Business Enterprise, Written 1 <br />Confirmation Documents, and Disadvantaged Business Enterprise Good Faith 2 <br />Effort documentation are included in Sections 1-02.9 and 1-02.10. 3 <br /> 4 <br />1-02.6.OptionB.RTF 5 <br />(January 4, 2024 APWA GSP 1-02.6, Option B) 6 <br /> 7 <br />Supplement the second paragraph with the following: 8 <br />4. If a minimum bid amount has been established for any item, the unit or lump sum 9 <br />price must equal or exceed the minimum amount stated. 10 <br />5. Any correction to a bid made by interlineation, alteration, or erasure, shall be 11 <br />initialed by the signer of the bid. 12 <br /> 13 <br />Delete the last two paragraphs, and replace them with the following: 14 <br /> 15 <br />The Bidder shall submit with their Bid a completed Contractor Certification Wage Law 16 <br />Compliance form, provided by the Contracting Agency. Failure to return this certification 17 <br />as part of the Bid Proposal package will make this Bid Nonresponsive and ineligible for 18 <br />Award. A Contractor Certification of Wage Law Compliance form is included in the 19 <br />Proposal Forms. 20 <br /> 21 <br />The Bidder shall make no stipulation on the Bid Form, nor qualify the bid in any manner. 22 <br /> 23 <br />A bid by a corporation shall be executed in the corporate name, by the president or a 24 <br />vice president (or other corporate officer accompanied by evidence of authority to sign). 25 <br /> 26 <br />A bid by a partnership shall be executed in the partnership name, and signed by a 27 <br />partner. A copy of the partnership agreement shall be submitted with the Bid Form if any 28 <br />DBE requirements are to be satisfied through such an agreement. 29 <br /> 30 <br />A bid by a joint venture shall be executed in the joint venture name and signed by a 31 <br />member of the joint venture. A copy of the joint venture agreement shall be submitted 32 <br />with the Bid Form if any DBE requirements are to be satisfied through such an 33 <br />agreement. 34 <br /> 35 <br />1-02.6(1).RTF 36 <br />Add the following new section: 37 <br /> 38 <br />1-02.6(1) Recycled Materials Proposal 39 <br />(January 4, 2016 APWA GSP) 40 <br /> 41 <br />The Bidder shall submit with the Bid, its proposal for incorporating recycled materials into 42 <br />the project, using the form provided in the Contract Provisions. 43 <br /> 44 <br />1-02.7.RTF 45 <br />1-02.7 Bid Deposit 46 <br />(March 8, 2013 APWA GSP) 47 <br /> 48 <br />Supplement this section with the following: 49 <br /> 50 <br />Bid bonds shall contain the following: 51
The URL can be used to link to this page
Your browser does not support the video tag.