Laserfiche WebLink
<br />Fulton Street Pedestrian Bicycle Corridor PAGE 12 OF 114 CONTRACT <br />FEDERAL AID # TAP-0420(026) <br />WO #3785 September 6, 2024 <br /> <br />4. Be conditioned upon the payment of taxes, increases, and penalties incurred on the 1 <br />project under titles 50, 51, and 82 RCW; and 2 <br />5. Be accompanied by a power of attorney for the Surety’s officer empowered to sign 3 <br />the bond; and 4 <br />6. Be signed by an officer of the Contractor empowered to sign official statements (sole 5 <br />proprietor or partner). If the Contractor is a corporation, the bond(s) must be signed 6 <br />by the president or vice president, unless accompanied by written proof of the 7 <br />authority of the individual signing the bond(s) to bind the corporation (i.e., corporate 8 <br />resolution, power of attorney, or a letter to such effect signed by the president or vice 9 <br />president). 10 <br /> 11 <br />1-03.7.RTF 12 <br />1-03.7 Judicial Review 13 <br />(December 30, 2022 APWA GSP) 14 <br /> 15 <br />Revise this section to read: 16 <br /> 17 <br />All decisions made by the Contracting Agency regarding the Award and execution of the 18 <br />Contract or Bid rejection shall be conclusive subject to the scope of judicial review 19 <br />permitted under Washington Law. Such review, if any, shall be timely filed in the Superior 20 <br />Court of the county where the Contracting Agency headquarters is located, provided that 21 <br />where an action is asserted against a county, RCW 36.01.050 shall control venue and 22 <br />jurisdiction. 23 <br /> 24 <br />1-04.2.RTF 25 <br />1-04.2 Coordination of Contract Documents, Plans, Special Provisions, 26 <br />Specifications, and Addenda 27 <br />(December 30, 2022 APWA GSP) 28 <br /> 29 <br />Revise the second paragraph to read: 30 <br /> 31 <br />Any inconsistency in the parts of the contract shall be resolved by following this order of 32 <br />precedence (e.g., 1 presiding over 2, 2 over 3, 3 over 4, and so forth): 33 <br />1. Addenda, 34 <br />2. Proposal Form, 35 <br />3. Special Provisions, 36 <br />4. Contract Plans, 37 <br />5. Standard Specifications, 38 <br />6. Contracting Agency’s Standard Plans or Details (if any), and 39 <br />7. WSDOT Standard Plans for Road, Bridge, and Municipal Construction. 40 <br /> 41 <br />1-04.4.RTF 42 <br />1-04.4 Changes 43 <br />(January 19, 2022 APWA GSP) 44 <br /> 45 <br />The first two sentences of the last paragraph of Section 1 -04.4 are deleted. 46 <br /> 47 <br />1-04.4(1).RTF 48 <br />1-04.4(1) Minor Changes 49 <br />(May 30, 2019 APWA GSP) 50 <br /> 51