My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthwork Solutions, LLC 1/15/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthwork Solutions, LLC 1/15/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2025 1:51:12 PM
Creation date
1/15/2025 1:36:28 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthwork Solutions, LLC
Approval Date
1/15/2025
Council Approval Date
9/11/2024
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
FULTON STREET PEDESTRIAN BICYCLE CORRIDOR
Tracking Number
0004652
Total Compensation
$663,840.07
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
499
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Fulton Street Pedestrian Bicycle Corridor PAGE 12 OF 114 CONTRACT <br />FEDERAL AID # TAP-0420(026) <br />WO #3785 September 6, 2024 <br /> <br />4. Be conditioned upon the payment of taxes, increases, and penalties incurred on the 1 <br />project under titles 50, 51, and 82 RCW; and 2 <br />5. Be accompanied by a power of attorney for the Surety’s officer empowered to sign 3 <br />the bond; and 4 <br />6. Be signed by an officer of the Contractor empowered to sign official statements (sole 5 <br />proprietor or partner). If the Contractor is a corporation, the bond(s) must be signed 6 <br />by the president or vice president, unless accompanied by written proof of the 7 <br />authority of the individual signing the bond(s) to bind the corporation (i.e., corporate 8 <br />resolution, power of attorney, or a letter to such effect signed by the president or vice 9 <br />president). 10 <br /> 11 <br />1-03.7.RTF 12 <br />1-03.7 Judicial Review 13 <br />(December 30, 2022 APWA GSP) 14 <br /> 15 <br />Revise this section to read: 16 <br /> 17 <br />All decisions made by the Contracting Agency regarding the Award and execution of the 18 <br />Contract or Bid rejection shall be conclusive subject to the scope of judicial review 19 <br />permitted under Washington Law. Such review, if any, shall be timely filed in the Superior 20 <br />Court of the county where the Contracting Agency headquarters is located, provided that 21 <br />where an action is asserted against a county, RCW 36.01.050 shall control venue and 22 <br />jurisdiction. 23 <br /> 24 <br />1-04.2.RTF 25 <br />1-04.2 Coordination of Contract Documents, Plans, Special Provisions, 26 <br />Specifications, and Addenda 27 <br />(December 30, 2022 APWA GSP) 28 <br /> 29 <br />Revise the second paragraph to read: 30 <br /> 31 <br />Any inconsistency in the parts of the contract shall be resolved by following this order of 32 <br />precedence (e.g., 1 presiding over 2, 2 over 3, 3 over 4, and so forth): 33 <br />1. Addenda, 34 <br />2. Proposal Form, 35 <br />3. Special Provisions, 36 <br />4. Contract Plans, 37 <br />5. Standard Specifications, 38 <br />6. Contracting Agency’s Standard Plans or Details (if any), and 39 <br />7. WSDOT Standard Plans for Road, Bridge, and Municipal Construction. 40 <br /> 41 <br />1-04.4.RTF 42 <br />1-04.4 Changes 43 <br />(January 19, 2022 APWA GSP) 44 <br /> 45 <br />The first two sentences of the last paragraph of Section 1 -04.4 are deleted. 46 <br /> 47 <br />1-04.4(1).RTF 48 <br />1-04.4(1) Minor Changes 49 <br />(May 30, 2019 APWA GSP) 50 <br /> 51
The URL can be used to link to this page
Your browser does not support the video tag.