|
GENERAL NOTES
<br /> 1. COORDINATE PHASING WITH MECHANICAL CONTRACTOR AND r- BOGARD I PASCUA
<br /> OWNER. ENGINEERS,PS
<br /> (E)PNL DP2A (E)PNL DP2A ELECT CONSULTINGENGUMEERS
<br /> 2. REMOVE AND RECONNECT EXISTING CIRCUIT TO HVAC
<br /> 204 EQUIPMENT BEING REPLACED,UNLESS NOTED OTHERWISE. 221211MA—SE,Sii9 11
<br /> B*KW4hingm 80�I
<br /> (E)PNL CP2 (E)PNL CP2 42s41ss100
<br /> 3. EXTEND FEEDER WHIP OR PROVIDE NEW,AS REQUIRED FOR
<br /> NEW HVAC EQUIPMENT CONNECTION POINT. COORDINATE
<br /> WITH MECHANICAL CONTRACTOR.
<br /> (R)LOOP PUMP 4. PROVIDE NEW CONDUIT FOR CONTROL WIRING,AS
<br /> REQUIRED BY MECHANICAL CONTRACTOR. �.; A. q A
<br /> _ v o
<br /> (R)LOOP PUMP (Mi L26,28,30 T (E)PNL LP2
<br /> (R)HEAT EXCHANGER — — x
<br /> (N)LP-2 K DETAIL NOTES
<br /> M1-32,34,36 (E)TRANSFORMER T2
<br /> '> POWER PANEL LOCATED IN ATTIC. L
<br /> (N)M-14,16,18 (N)BP (E)
<br /> (E)PNL DP2
<br /> M1-14,16,18
<br /> (E)PNL SL1 (E)TRANSFORMER T3 SCOPE OF WORK
<br /> (R)COOLING TOWER PUMP (N)B 1 T
<br /> (R)BOILER DP2AA-28,30,32 (N)B-2 1. DE-ENERGIZE AND DISCONNECT WIRING FROM HVAC
<br /> LP1-6,8,10 EQUIPMENT TO BE REMOVED.
<br /> 2.REMOVE HVAC EQUIPMENT DESIGNATED FOR REMOVAL. wool 1CeI CODSuIle^Inc
<br /> 3.INSTALL NEW HVAC EQUIPMENT.ENSURE NEW HVAC 19015 36th Avenue West,Suite E
<br /> M EQUIPMENT IS PROPERLY MOUNTED. Lynnwood,Washington 98036
<br /> Phone(425)775-1799 FAX(425)77498
<br /> 4.REPLACE WIRING AND CONDUIT AS NEEDED PER HVAC
<br /> CONNECTION SCHEDULE.
<br /> 1 5.ENERGIZE EQUIP.
<br /> ENLARGED BOILER ROOM DEMOLITION ENLARGED BOILER ROOM INSTALLATION MEZZANINE LEVEL
<br /> SCALE: 1/4"=1'-O" Q SCALE 1/4"= V-0" Q SCALE: 1/4„= 1'-0„ Q SEE ENLARGED VIEW \.J
<br /> THIS SHEET
<br /> 3 4 E1 5 A7 6 7 8 9 10 11 12 13 15 16 17 19 20
<br /> D11A ��18
<br /> H
<br /> /.CP2
<br /> A O
<br /> MDP D� 8 CLA SROOM T C ASSROOM CLASSROOM
<br /> 09 BOILER I I 211 212 P� O
<br /> o FACULTY M _ I ROOM I O
<br /> AB LOUNGE ® DP2A 2t I j HP-20
<br /> M1A-37,39,41 E-DW i i Mi-13,15,17 T 1
<br /> HP-sLL PHASE 7 E M2A-s I PZA i9 I MU U
<br /> I ® -- i--
<br /> EF-2 to
<br /> -DR- M1A EF-11 M1 P�e 1 EF-2 W HP-11 TORAGE HP-21
<br /> D� B112-3s,37,39 B112-22,24,26 M1A-20,22,N F
<br /> M2A--4 EF-7 - �/ M1-7.9.n
<br /> _ $ DP2A-31
<br /> fil
<br /> AC M L W ADP -- Q W o
<br /> 00
<br /> KITCHEN CLASSROOM
<br /> 3U
<br /> U 0 0 — ILI
<br /> HP-1 HP-19 213
<br /> UP M1A-26,28,30 M1-19,21,23
<br /> HP-8
<br /> 2 As M,A-13,15,17 � — — �® PHASE 3
<br /> HP-13 — THEATER — —
<br /> ENTRY PHASE 6 M1A-25,27,29
<br /> _ _ FOY R T HP-22
<br /> YSTEMS M2A 917 E2 P5,7 7 ———— MD�CHORAL M1A-37,33,35
<br /> OFFICE 1
<br /> M1A-2,4,6
<br /> F — — — — mien L
<br /> — — — PRACT — —
<br /> HP-14 4
<br /> MIA-19,21� DN
<br /> PRACT
<br /> HP-6
<br /> M2A-1,3 M2A-13,15,17 G HP_23 — —
<br /> NNNN1111I111 _ DP2A-1,3
<br /> H SEE ENLARGED S�TO
<br /> THIS SHEET HP-
<br /> J — — — — MEZZAZINE VIEW
<br /> z W P raa.Ma 21015.00
<br /> -------- o M1-25,27,29
<br /> yyI
<br /> FOYER I owtwxer: LRD
<br /> - a g CHECKED W.BA
<br /> HP 1
<br /> M1A-14,16,18 I I HP-8 _ PRACT p3 DATE: o8-3a2o22
<br /> K — — — — — — — — — Mi-31,33,35 DP2-19
<br /> B>_vre�ora REVISION I ISSUE DATE
<br /> LIBRARY M P-1II STUD NT CENTER STAGE � I DPz B-LHUP
<br /> II Q i I CLASSROOM
<br /> PHASE 5 PHASE 4 PH�SE 2 UP
<br /> HP- "" $ T M2A-19,21 T
<br /> � \�� /
<br /> o Mt-1,3,5 R Q
<br /> EF-13 WHEELCHAIR LIFI
<br /> DP1A-21 o PHASE 1 Q
<br /> P HP-4
<br /> — Q
<br /> MIA-8,10,12 DP1A-9 Ll UP BAND
<br /> Q W OFC DP COPY ROOM
<br /> HP-17 217
<br /> ENTRY 0 DP2A-5,7
<br /> EF-1 HP-16
<br /> M2A-4 M1-2,4,6 2 OG EF-iQ
<br /> 200A MEICH DP2-29
<br /> ACTIVITY C R BELOW
<br /> 200
<br /> DP1A OFC ON
<br /> CP1 M r7l
<br /> B 260D
<br /> Ez
<br /> AJ M2A-s,7 HP- 5
<br /> UP M1-20,22,24
<br /> DP
<br /> B L V G 200 SHEET TITLE
<br /> — POWER PLAN
<br /> L 1 o == o I I I I I I I I I I I I � — I —
<br /> SHEET NUMBER
<br /> 2 A3 A4 3 A6 6 8 9 A7 10 AS 11 A9 13 14 A10 15 01
<br /> 17 1
<br /> 1
<br /> 8
<br /> 20 A15 21 A16
<br /> POWER PLAN El A
<br /> SCALE: 1/8"=1'-0"
<br /> " "° SHEET2 OF 1
<br />
|