Laserfiche WebLink
- D0 NOT SCAT F DRAWINGS.CONTRACTOR MUST VERIFY ALL <br /> DIMENSIONS AND ADVISE CONSULTANTS OF ANY ERRORS OR <br /> OMISSIONS.NO VARIATIONS OR MODIFICATIONS TO WORK <br /> UGT UGT-UGT UGT UGT UGT UGT UGT SHOWN SHALL BE IMPLEMENTED WITHOUT PRIOR WRITTEN <br /> O NOT USED UGT -UGT UGT -UGT UGT UGT UGT UGT SEE SHEET E-2 APPROVAL D11 PTHEIOATUS ISSUES OF. ISAL DRAWING AREA <br /> a FOR CONTINUATION SUPERSEDED BY THE LATEST REVISION.ALL DRAWINGS AND <br /> ISON <br /> 2 NEW 24"x24" NEMA-3R ENCLOSURE (FIBER/SITE TECH CABINET) MOUNTED ON H—FRAME. ` SPECIFICATIONS C REMAIN THE PROPERTY RIF OMNRHERS <br /> O - NORSTH EIA CORPORATION.NETHER ING CONS RUCTION ID <br /> �„ J® U lk UGP/ UGP NOR THE ARCHnECi WILL BE PROVIDING CONSTRUCTION <br /> O PROPOSED 2" PVC CONDUIT WITH (3) 1-1/4" INNERDUCTS AND TRACEABLE MULE TAPE �-��/— \�.\/�/ ��J—� REVIEW OF THIS PROJECT. <br /> 3 <br /> FROM NEMA-3R TELCO ENCLOSURE TO FIBER CABINET. \' X X— X X - X X O x _ . r <br /> 0 NEW (2) #12 AWG CU. AND (1) #12 AWG CU. GROUND IN 1/2" RNC. <br /> O PROPOSED FIBER HANDHOLE/PULLBOX. COORDINATE WITH FIBER PROVIDER FOR NEW \\ G� =��—��- C E T�"' <br /> SERVICE. <br /> ONOT USED. <br /> O NOT USED. V <br /> O NEW (3) #3/0 AWG CU. IN 3" RNC. ,• - A <br /> (55 <br /> _ . <br /> I <br /> O EXISTING UTILITY POLE MOUNTED TRANSFORMER. COORDINATE WITH UTILITY FOR NEW ® IR f`f ,- ', �/ <br /> 120/240V-14-3W, 200A FROM UTILITY POLE TO UTILIT( POLE AND THEN UNDERGROUND _--.�_ ! le„,,/,- <br /> CIRCUIT i ,,,}}} <br /> SERVICE TO VERIZON WIRELESS METER. _ <br /> 10 NEW (ILC) INTEGRATED LOAD CENTER, NEMA-3R PPC LOAD CENTER (PANEL "PPI") ( \ i `_ :GI _j 1 x 111 ,! ��1 ` ' <br /> COMPLETE WITH AN INTEGRATED AUTOMATIC TRANSFER SWITCH, A 200A-2P UTILITY MAIN s \' <\ ' , `+�\NN <br /> BREAKER & A 200A-2P EMERGENCY MAIN CIRCUIT BREAKER. \\ \\\ �® \� UGP \\ �''Sjo (, `, <br /> 11 GENERATOR PLUG. \ \\ a \ <br /> 12 (3) 3/0 + (1) #6 GROUND, 2"C. PROVIDE RNC B.F.G. AND RGS A.F.G. NNN-, <br /> \. \\ \�\ 1 <br /> V <br /> 13 NNEW2P-200A MAIN CIRCUIT BREAKER IN METER/MAIN CIRCUIT BREAKER COMBO WITH \\ \\\\ I\�\ <br /> INTERRUPTING CAPACITY=100K AC, PROVIDE MECH. ATTACHED ENGRAVED LABEL INDICATING \- \\. I J CONSTRUCTION <br /> "VERIZON WIRELESS METER". <br /> 14 NEW 120/240V-14-3W, 200A RATED METER/MAIN CIRCUIT BREAKER COMBO MOUNTED AT \ X <br /> NEW H—FRAME. PROVIDE MECH. ATTACHED ENGRAVED LABEL INDICATING 'VERIZON �\ <br /> WIRELESS METER". <br /> 15 NEW 200A CAPACITY 240V-14 NEMA 3R METER SOCKET PER POWER CO. REQUIREMENTS. 27 26 X <br /> 0. PROPOSED (2) 4" PVC CONDUIT WITH (3) 1-1/4" INNERDUCTS AND TRACEABLE MULE <br /> TAPE FROM POINT OF FIBER CONNECTION TO NEMA-3R TELCO ENCLOSURE. INSTALL 1 06/21/19 JURISDICTION COMMENTS <br /> CONDUITS IN A 36" BELOW GRADE TRENCH. COORDINATE EXACT REQUIREMENTS WITH FIBER <br /> PROVIDER. 0 06/14/18 FINAL CONSTRUCTION <br /> 17 BOND TO GROUND RING W/#2 AWG SOLID TINNED COPPER. <br /> A 03/22/18 ISSUED FOR REVIEW <br /> 18 NEW MIN. #4 AWG CU TO (2) 5/8"X10' COPPER CLAD RODS SPACED A MINIMUM OF 6' <br /> APART. VERIFY IN HE X No. Date Revision <br /> 19 NOT USED. Client: <br /> 20 NEW 2" CONDUIT FOR EQUIPMENT CABINET REFER TO LOAD CENTER DIAG. SHEET E-6 <br /> 21 NOT USED.22 NOT USED. verizon <br /> 23 NEW H—FRAME FOR VERIZDN EQUIPMENT. • <br /> 44 CONTRACTOR TO ARRANGE TO PAY FOR UNDERGROUND UTILITY LOCATION SURVEYS FOR x <br /> ALL TRENCHING. REUSE NATIVE BACKFILL AND REINSTATE TO ORIGINAL CONDITION. INSTALL <br /> 6"WIDE METALLIC LINE RED PLASTIC MARKER TAPE 8"ABOVE ALL BURIED CONDUIT. <br /> Implementation Team: <br /> O. NOT USED. \, <br /> 26 NEW RADIO CABINET. \• / \\.� n CROWN <br /> 27 NEW PRIMARY POWER AND BATTERY ENCLOSURE. `j CASTLE <br /> 28 NEW H—FRAME LIGHT (LTTHONIA CAT #HFL1—LED—P1-40K—WFL—MVOLT OR EQUIVALENT). <br /> 1505 WESTLAKE AVE N,SUITE 80D <br /> SEATTLE,WA 98109 <br /> 29 NEW 4 TO 6 HOUR CRANK TIME LIGHT SWITCH IN WEATHERPROOF ENCLOSURE. <br /> 24"e36'a'ALP• 3/4'= 1'-0' ' ELECTRICAL PLAN 3 A&E Team: ■ <br /> 11'x17"SCALE: 3/8"— 1.-0' 1' 6 8 0' 1' <br /> A LIT] <br /> 0 MORRISON HERSHFIELD <br /> 600 STEWART ST,SUITE 200 <br /> SEATTLE,WA 98101 <br /> 07'1A OHP Tel:206.268.7370 <br /> 26 27 <br /> 0 ®® w ry.mo risonhe shfeld.com <br /> L I GI ®111) Project Info: <br /> fl—Z) BU# 825709 <br /> 0 i O MASONIC CENTER <br /> • 220 OLYMPIC BLVD. <br /> EVERETT, WA 98203 <br /> s_ _ <br /> 41, Drawing Title: <br /> m I � p ELECTRICAL PLAN, <br /> 16• NOTES AND <br /> GRADE ►1 0° L 041) i= -= L IIII RISER DIAGRAM <br /> q \ UGP UGP -i J UGP • UGP UGP UGP • Project Number: Start Date: <br /> 1800386 03/22/18 <br /> LIs. J O� Drafter. Designer. <br /> UGT UGT—UGT UGT <br /> UGT UGT UGT UGT UGT RR LB <br /> © UGT UGT UGT —UGT UGT Project Manager. Professional of Record: <br /> � RKL RL <br /> O® Revision No: Sheet No: <br /> 0 E-3 <br /> ELECTRICAL REFERENCE NOTES 2 4"836' SSCALE: NOT TO SCALE <br /> CALE: NOT TO SCALE RISER DIAGRAM 1 <br />