<br />Fulton Street Pedestrian Bicycle Corridor PAGE 93 OF 114 CONTRACT <br />FEDERAL AID # TAP-0420(026) <br />WO #3785 September 6, 2024 <br /> <br />the rejected material will be at the calculated CPF with an addition of 25 percent of the 1 <br />unit Contract price added for the cost of removal and disposal. 2 <br /> 3 <br />5-04.3(11)D Rejection - A Partial Sublot 4 <br />In addition to the random acceptance sampling and testing, the Engineer may also 5 <br />isolate from a normal sublot any material that is suspected of being defective in relative 6 <br />density, gradation or asphalt binder content. Such isolated material will not include an 7 <br />original sample location. A minimum of three random samples of the suspect material will 8 <br />be obtained and tested. The material will then be statistically evaluated as an 9 <br />independent lot in accordance with Section 1 -06.2(2). 10 <br /> 11 <br />5-04.3(11)E Rejection - An Entire Sublot 12 <br />An entire sublot that is suspected of being defective may be rejected. When a sublot is 13 <br />rejected a minimum of two additional random samples from this sublot will be obtained. 14 <br />These additional samples and the original sublot will be evaluated as an independent lot 15 <br />in accordance with Section 1-06.2(2). 16 <br /> 17 <br />5-04.3(11)F Rejection - A Lot in Progress 18 <br />The Contractor shall shut down operations and shall not resume HMA placement until 19 <br />such time as the Engineer is satisfied that material conforming to the Specifications can 20 <br />be produced: 21 <br /> 22 <br />1. When the Composite Pay Factor (CPF) of a lot in progress drops below 1.00 and 23 <br />the Contractor is taking no corrective action, or 24 <br />2. When the Pay Factor (PF) for any constituent of a lot in progress drops below 25 <br />0.95 and the Contractor is taking no corrective action, or 26 <br />3. When either the PFi for any constituent or the CPF of a lot in progress is less 27 <br />than 0.75. 28 <br /> 29 <br />5-04.3(11)G Rejection - An Entire Lot (Mixture or Compaction) 30 <br />An entire lot with a CPF of less than 0.75 will be rejected. 31 <br /> 32 <br />5-04.3(12) Joints 33 <br /> 34 <br />5-04.3(12)A HMA Joints 35 <br /> 36 <br />5-04.3(12)A1 Transverse Joints 37 <br />The Contractor shall conduct operations such that the placing of the top or wearing 38 <br />course is a continuous operation or as close to continuous as possible. Unscheduled 39 <br />transverse joints will be allowed and the roller may pass over the unprotected end of the 40 <br />freshly laid mixture only when the placement of the course must be discontinued for such 41 <br />a length of time that the mixture will cool below compaction temperature. When the Work 42 <br />is resumed, the previously compacted mixture shall be cut back to produce a slightly 43 <br />beveled edge for the full thickness of the course. 44 <br /> 45