Earthwork Solutions, LLC 1/30/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Earthwork Solutions, LLC 1/30/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 1:40:20 PM
Creation date
2/4/2025 1:26:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthwork Solutions, LLC
Approval Date
1/30/2025
Council Approval Date
9/11/2024
End Date
12/31/2025
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
FULTON STREET PEDESTRIAN BICYCLE CORRIDOR
Public Works WO Number
3785
Tracking Number
0004652
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
530
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Fulton Street Pedestrian Bicycle Corridor PAGE 98 OF 114 CONTRACT <br />FEDERAL AID # TAP-0420(026) <br />WO #3785 September 6, 2024 <br /> <br /> 1 <br />“Planing Bituminous Pavement (2” Deep)”, per square yard. 2 <br /> 3 <br />The Unit contract price for “Planing Bituminus Pavement (2” Deep), per square yard shall 4 <br />be full payment for all costs incurred to perform the work described in Section 5 -04.3(14). 5 <br />. 6 <br /> 7 <br />Approved Div 5.DOCX 8 <br />5-05 CEMENT CONCRETE PAVEMENT 9 <br /> 10 <br />5-05.2 Materials 11 <br />Section 5-05.2 is supplemented with the following: 12 <br /> 13 <br />Epoxy Coated Dowel Bars 9-07.5(1) Standard Specifications 14 <br /> 15 <br />The reference to Section 9-07.5(2) Corrosion Resistant Dowel Bars is deleted. 16 <br /> 17 <br />5-05.3 Construction Requirements 18 <br /> 19 <br />5-05.3(1) Concrete Mix Design for Paving 20 <br />Section 5-05.3(1) is deleted and replaced with the following: 21 <br /> 22 <br />The Contractor shall provide a concrete mix design for each design age of concrete 23 <br />specified in the Contract. The Contractor shall use ACI 211.1 as a guide to determine 24 <br />proportions. Concrete strength, placeability, and workability shall be the 25 <br />responsibility of the Contractor. Following approval of the Contractor’s proposal, all 26 <br />other requirements of Section 5-05 shall apply. 27 <br /> 28 <br />1. Materials. Materials shall conform to Section 5 -05.2. Fine aggregate shall 29 <br />conform to Section 9-03.1(2)B, Class 1. Coarse aggregate shall conform to 30 <br />Section 9-03.1(4) and shall conform to Section 9-03.1(4)C AASHTO grading 31 <br />No. 467 or an alternate gradation which has a minimum of 5 percent retained 32 <br />on the 1½-inch square sieve. Fly ash, if used, shall conform to Section 9 -33 <br />23.9 and shall be limited to Class F with a maximum CaO content of 15 34 <br />percent by weight. The fly ash shall be limited to 20 percent by weight, of 35 <br />the total cementitious material. As an alternative to the use of fly ash and 36 <br />cement as separate components, a blended hydraulic cement may be used. 37 <br />Blended hydraulic cement shall conform to ASTM C 595 Type IP(MS). 38 <br /> 39 <br />In making calculations relative to cement factor or allowable water/cement 40 <br />ratio, the total cementitious material shall be taken as the weight of Portland 41 <br />cement plus the weight of fly ash. 42 <br /> 43 <br />2. Submittals. The Contractor’s submittal for approval shall include the mix 44 <br />proportions per cubic yard and the proposed sources for all ingredients 45 <br />including the power plant that generated the fly ash. The mix shall be 46 <br />capable of providing a minimum flexural strength of 650 psi at 14 days. 47 <br />Evaluation of strength shall be based on statistically analyzed results of 5 48 <br />beam specimens and demonstrate a quality level of not less than 80 percent 49 <br />analyzed in accordance with Section 1 -06.2(2)D. In addition the Contractor 50 <br />shall fabricate, cure, and test 5 sets of cylinders using the same mixture as 51