Laserfiche WebLink
,A. i <br /> Roof Top Unit <br /> PROJECT: Kaiser Permanente EMCE DATE: 2/15/2024 <br /> LOCATION: Everett,WA CONTACT: Shane Moore <br /> PROJECT#: 230035 AUTHOR: Adam Hoskins <br /> SYSTEM/UNIT: RTU-01/VAV-1-1-02 w Tested By: Hayden Lindsay <br /> AREA: 1811 Work Station Date: 1/16/2024 <br /> ini�� Unit D. . Data <br /> Manufacturer Titus Design Primary Max CFM 935 CFM <br /> Model Number DESV Actual Max Primary CFM 980 CFM <br /> Controls System Siemens Design Primary Min.CFM 375 CFM <br /> VAV Type Shut-Off Actual Primary Min.CFM 400 CFM <br /> Box Inlet Size 10 RD <br /> K Factor 0.7 <br /> RTU-01/VAV-1-1-02 w Supply Outlet Summary <br /> T FIVI Reading Reading <br /> Outle1-01 1811 Work Station CD 12 RD 280 355 305 109 <br /> Outlet-02 1811 Work Station CD 12 RD 285 295 300 105 <br /> Outlet-03 1811 Work Station CD 12 RD 280 290 285 102 <br /> Outlet-04 1804 Utility Soiled CD 6 RD 90 80 90 100 <br /> Totals: 935 1020 980 <br /> RTU-01/VAV-1-1-02 w Autoflow Valve Summary <br /> r1A,tofloowalve- Heating Water Griswold MCK21RIR1 FH 2.00 2.00 2-32 8.00 <br /> Airtest Co. LLC <br /> Preliminary TAB Report <br />