My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8625 3RD AVE SE 2025-03-24
>
Address Records
>
3RD AVE SE
>
8625
>
8625 3RD AVE SE 2025-03-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 2:11:10 PM
Creation date
2/10/2025 9:48:15 AM
Metadata
Fields
Template:
Address Document
Street Name
3RD AVE SE
Street Number
8625
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8-01.3(10) Wattles <br /> Section 8-01.3(10) is supplemented with the following: <br /> Wattles shall be installed at back of sidewalk outside of disturbance area at all <br /> locations where existing sidewalk is removed and replaced. Installation and staking <br /> of wattles shall be per the Contract Plans. <br /> 8-01.5 Payment <br /> 8-01.5(1) Lump Sum Bid for Project (No Unit Items) <br /> Section 8-01.5(1) is supplemented with the following: <br /> "Erosion Control and Water Pollution Prevention," lump sum. <br /> The lump sum contract price for"Erosion Control and Water Pollution Prevention" <br /> shall include full compensation for all labor, equipment, and materials necessary <br /> to create and implement a TESC Plan and furnish, install, maintain, and remove <br /> all erosion control and water pollution prevention measures as described in Section <br /> 8-01 as amended in the Special Provisions and comply with the provisions of the <br /> latest edition of the Stormwater Management Manual of Western Washington, <br /> Department of Ecology. Alderwood Water&Wastewater District requirements and <br /> City of Everett requirements must also be met. These measures include, but are <br /> not limited to, covering exposed soils or earthen materials with plastic sheeting, <br /> wattles, catch basin insets, and silt fence. <br /> Payment shall be made up to 75 percent based on proportion of work completed <br /> requiring temporary erosion and sediment control. The final 25 percent shall be <br /> made upon restoration and project completion. <br /> END OF SECTION 8-01 <br /> Alderwood Water&Wastewater District <br /> W2301 Trans Main 1 &2 Valve Replacement 9-01/4 Contract No. W2301 <br /> October 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.