Laserfiche WebLink
April, 14, 2023 G-5844 <br /> 7105 —Juniper Dr, Everett, WA Page 4 <br /> CONCLUSION <br /> Based on the results of our analysis, it is our opinion that the retaining wall at the subject <br /> property has been constructed such that it will not adversely impact the adjacent properties or <br /> increase the potential for soil movement and slope instability at the subject property. <br /> CLOSING <br /> We appreciate the opportunity to provide you with geotechnical engineering services for this <br /> project. Please do not hesitate to contact us if you have any questions regarding these documents. <br /> Sincerely, \NM ckj � <br /> OF WASy, <br /> GEO Group Northwest, Inc. <br /> (\ 9 2 0114 `� <br /> F�ISTIYA' <br /> Dated: 4/14/23 <br /> Andrew Hoff, G.I.T. William Chang, P.E. <br /> Staff Engineering Geologist Principal Engineer <br /> Attachments: <br /> Plate I —Site Plan <br /> Plate 2 - Wall Cross Sections &Elevation View <br /> Appendix A —Retaining Wall Calculations <br /> GEO Group Northwest, Inc. <br />