Laserfiche WebLink
SECTION 01 3000 <br /> ADMINISTRATIVE REQUIREMENTS <br /> PART 1 GENERAL <br /> 1.01 SECTION INCLUDES <br /> A. General administrative requirements. <br /> B. Electronic document submittal service. <br /> C. Preconstruction meeting. <br /> D. Site mobilization meeting. <br /> E. Progress meetings. <br /> F. Construction progress schedule. <br /> G. Contractor's daily reports. <br /> H. Progress photographs. <br /> I. Coordination drawings. <br /> J. Submittals for review, information, and project closeout. <br /> K. Number of copies of submittals. <br /> L. Requests for Interpretation (RFI) procedures. <br /> M. Submittal procedures. <br /> 1.02 RELATED REQUIREMENTS <br /> A. Section 01 6000 - Product Requirements: General product requirements. <br /> B. Section 01 7000 - Execution and Closeout Requirements: Additional coordination <br /> requirements. <br /> 1.03 REFERENCE STANDARDS <br /> A. AIA G716 - Request for Information 2004. <br /> B. CSI/CSC Form 13.2A- Request for Information Current Edition. <br /> 1.04 GENERAL ADMINISTRATIVE REQUIREMENTS <br /> A. Comply with requirements of Section 01 7000 - Execution and Closeout Requirements for <br /> coordination of execution of administrative tasks with timing of construction activities. <br /> B. Make the following types of submittals to Designer/Consultant: <br /> 1. Requests for Interpretation (RFI). <br /> 2. Requests for substitution. <br /> 3. Submittals, Shop drawings, product data, and samples. <br /> 4. Test and inspection reports. <br /> 5. Design data. <br /> 6. Manufacturer's instructions and field reports. <br /> 7. Applications for payment and change order requests. <br /> 8. Progress schedules. <br /> 9. Coordination drawings. <br /> 10. Correction Punch List and Final Correction Punch List for Substantial Completion. <br /> 11. Closeout submittals. <br /> 1.05 SUBMITTAL REQUIREMENTS: <br /> A. After Contractor's receipt of notice to proceed, and prior to the preconstruction meeting, <br /> Contractor shall submit 4 sets of submittals to BLUEFIN LLC, a division of Mantis Innovation, <br /> 6312 South Fiddlers Green Circle, Ste 100E, Greenwood Village, CO 80111 or via email to <br /> SEA00511 / Prologis - SEA00511 01 3000 - 1 Administrative Requirements <br /> - FY24- Everett 1 - Capital <br /> Roofing Project <br />